
ENGLISH
The cluster shall be wall-mounted by using two “U”
brackets (in this example: the left “U” bracket is under
the linking support, the right “U” bracket is on the
linking support).
Both the “U” brackets are to be mounted parallel to
the central loudspeaker axis: pay attention to the three
spaces between teeth to be used (in this example,
pointed out in grey in the right “U” brackets).
First mount the “U” bracket (the right one in this
example) on the linking support and tighten the relevant
two (up and down) round knobs / bolts.
Then add the other “U” bracket (the left one in this
example) under the linking support and tighten the
relevant two (up and down) round knobs / bolts.
Loosen (just a little bit) the two round knobs / bolts of
the central loudspeaker momentarily, in order to allow
an easier insertion of the “U” bracket.
Then, make sure all knobs are tightened properly.
Always place the washers
G
and
H
as previously
indicated.
Now the cluster is ready to be fixed to the two
wall-mounted accessories by tightening the two
bolts.
Note:
the two mounting accessories are to be installed
to a wall respecting the fixed distance (ca.117 mm)
between their axes.
At the end of this manual, a drilling template is
provided to simplify the installation of the two mounting
accessories. Then the 3 safety steel cables (previously
attached to the mounting accessory screws) can be
fixed to the loudspeakers.
Left “U” brackets
Right “U” brackets
Linking
supports
Linking
supports
C
C
B
B
parallel
45°
45°
Summary of Contents for MQ80P
Page 27: ......