![RC GROUP TRIPACK Series Installation, Use And Maintenance Manual Download Page 30](http://html1.mh-extra.com/html/rc-group/tripack-series/tripack-series_installation-use-and-maintenance-manual_792524030.webp)
Chapter 5 - CALIBRATION AND TUNE-UP INFORMATION
RC GROUP S.p.A I_TRP_0909_GB
30
5 CALIBRATION
AND
TUNE-UP
INFORMATION
5.1 CALIBRATION AND TUNE-UP PROCEDURES
Upon the commissioning of the machine, after any failure or
replacement, upon any ordinary or extraordinary maintenance jobs, the
operation checking devices could need a re-calibration or tune-up.
These jobs (the most important are listed below) must be effected by a
specialized Engineer:
– Expansion valve calibration.
– Water
flow
calibration
– Calibration of the refrigerant circuit parameters.
– Microprocessor
calibration.