background image

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SYDNEY  |  MELBOURNE  |  BRISBANE  |  PERTH  |  AUCKLAND

Australia   

1300 788 778   www.rba.com.au   |   

New Zealand   

0800 722 111  www.rbagroup.co.nz

2 of 4

You Are Responsible For The Safe Operation Of This Unit 

Attention

For optimum installation use at least 4 suitable screws for each wall plate. Screws should be selected to suit the wall type. Grab rails are 
no stronger than the anchors or walls to which they are attached, and therefore, must be firmly secured in order to support the loads for 
which they are intended. 

Maintenance and Cleaning Instructions

Do not use detergents containing bleach, acids, alkalis, or chlorine or abrasive products. Do not use abrasive objects (e.g. scouring pads). 
Do not use chemicals that can damage plastic. Clean the surface with water and a neutral detergent; rinse carefully and dry with a clean 
cloth. If alternative cleaning methods and/or chemicals are used, warranty may become void.

Important Warnings

Exceeding the maximum load values may cause permanent product damage. If this happens, cease use until checked by a specialised 
maintenance person. Improper use, such as for gymnastic exercises or as a step, may cause accidents with serious consequences. Reliable 
operation and product safety depend on the way the products are installed and used. 

Ensure installation is performed by qualified personnel. Incorrect installation can seriously compromise product functionality.

 

Tools Required

• 

Plumbers Tape

• 

Screw Driver

• 

Extended Driver Bit

• 

Spirit Level

Components Supplied

2x Flange Cover

2x Bracket Post

2x Bolt

12x Screw

12x Pin

1x Rail

2x Wall Plate

2x Flange Button

Summary of Contents for Raffaello RBA4601 Series

Page 1: ...mbulant Grab Rail Matte Black RBA4601 019 Raffaello 90 Ambulant Grab Rail Chrome RBA4601 SERIES RBA4600 019 shown As improvements in the design and performance of RBA products are continuous specifications may be subject to change without notice The illustrations and descriptions herein are applicable to production as of the date of this Installation Instructions Sheet Revised 12 22 2022 by RBA Gr...

Page 2: ...ing pads Do not use chemicals that can damage plastic Clean the surface with water and a neutral detergent rinse carefully and dry with a clean cloth If alternative cleaning methods and or chemicals are used warranty may become void Important Warnings Exceeding the maximum load values may cause permanent product damage If this happens cease use until checked by a specialised maintenance person Imp...

Page 3: ...u New Zealand 0800 722 111 www rbagroup co nz 3 of 4 7 Straighten the rail 1 Lay rail flat with thread facing up 8 Mark location to install 2 Place bracket post onto rail 9 Check intended mounting location is level 3 Slide flange cover over post 4 Insert bolt through wall plate 5 Insert fixing wall bracket and assemble 6 Tighten ...

Page 4: ...ww rbagroup co nz 4 of 4 10 Position flange cover so the hole is over the screw fixing point Secure the first screw 11 Rotate the flange cover so the hole is positioned over a new screw fixing point 12 Repeat until all provided screws are securing the wall plate 13 Push flange cover over wall plate and insert flange button Repeat for all other fixing points ...

Reviews: