INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY
|
MELBOURNE
|
BRISBANE
|
PERTH
|
AUCKLAND
Australia
1300 788 778 www.rba.com.au
|
New Zealand
0800 722 111 www.rbagroup.co.nz
2
YOU ARE RESPONSIBLE FOR THE SAFE OPERATION OF THIS UNIT
Attention
For optimum installation use at least 4 suitable screws for each wall-plate. Screws should be
selected to suit the wall type.
Grab Rails are no stronger than the anchors or walls to which they are attached, and therefore,
must be fi rmly secured in order to support the loads for which they are intended.
Maintenance and cleaning instructions
Do not use detergents containing bleach, acids, alkalis, or chlorine or abrasive products. Do not
use abrasive objects (e.g. scouring pads). Do not use chemicals that can damage plastic. Clean
the surface with water and a neutral detergent; rinse carefully and dry with a clean cloth. If
alternative cleaning methods and/or chemicals are used, warranty may become void.
Important Warnings
Exceeding the maximum load values may cause permanent product damage. If this happens,
cease use until checked by a specialised maintenance person. Improper use, such as for
gymnastic exercises or as a step, may cause accidents with serious consequences. Reliable
operation and product safety depend on the way the products are installed and used.
Ensure installation is performed by qualifi ed personnel. Incorrect installation can seriously
compromise product functionality.
Tools Required
Plumbers Tape
Screw Driver
Extended Driver Bit
Spirit Level
Components Supplied
2x Flange Cover
2x Bracket Post
2x Bolt
8x Screw
8x Wall Plug
1x Horizontal Rail
1x Vertical Rail
1x Rail Bracket
2x Wall Plate
2x Flange Button
2x Screw Cover
1x Rail Connector
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY
|
MELBOURNE
|
BRISBANE
|
PERTH
|
AUCKLAND
Australia
1300 788 778 www.rba.com.au
|
New Zealand
0800 722 111 www.rbagroup.co.nz
3
7. Repeat for other fi xing
points.
1. Lay rail fl at with thread
facing up.
9. Connect rails.
2. Place bracket post onto
rail.
3. Slide fl ange cover over
post.
4. Insert bolt through wall
plate.
5. Insert wall plate and bolt
assembly
6. Tighten.
8. Screw rail bracket into
threaded insert