background image

4

Model

Nominal*

Capacity

Diameter

Overall

Length

Boiler

Connection

Pool

Connection

SS316L

CR24**

Super Alloy

BTU/hr

Inches

Inches

NPT

NPT

RP-045

45,000

3.15

10.5

3/4”

1”

RP-075

75,000

3.15

13.5

3/4”

1-1/2”

RP-125

125,000

3.15

15.5

3/4”

1-1/2”

RP-185

CR24-185

185,000

4.0

15.0

1”

1-1/2”

RP-245

245,000

4.0

20.2

1”

1-1/2”

RP-305

CR24-305

305,000

4.0

25.0

1”

1-1/2”

RP-495

CR24-495

495,000

4.0

43.0

1”

2”

RP-995

995,000

5.5

36.1

2”

2”

* Nominal values are based on 140 °F temperature differential between incoming heating and heated water.
** CR24 Super Alloy - widely used in industrial salt water environments. Due to its unsurpassed corrosion resistance, this

unique super alloy option is a ‘true’ salt water product, now available from Raypak for the most demanding of applica-

tions, from high chlorination to high salt content.

HEAT SOURCE

WATER IN

POOL WATER OUT

HEAT SOURCE

WATER OUT

POOL WATER IN

Figure 1: Dimensions

Table 1: Specifications

SS316L

CR24

Super Alloy

L

(in.)

A

(in.)

B

(in.)

C

(in.)

D

(in.)

F

(NPT)

G

(NPT)

RP-045

10.5

4.17

4.39

3.05

3.15

1”

3/4”

RP-075

13.5

4.17

6.89

3.35

3.15

1-1/2”

3/4”

RP-125

15.5

4.17

8.86

3.35

3.15

1-1/2”

3/4”

RP-185

CR24-185

15.0

5.04

7.60

3.74

4.0

1-1/2”

1”

RP-245

20.2

5.04

12.72

3.74

4.0

1-1/2”

1”

RP-305

CR24-305

25.0

5.04

17.40

3.74

4.0

1-1/2”

1”

RP-495

CR24-495

43.0

5.04

34.80

3.96

4.0

2”

1”

RP-995

36.1

6.57

26.63

4.72

5.5

2”

2”

Table 2: Physical Dimensions

Summary of Contents for RP-045

Page 1: ...of qualified individuals specially trained and experienced in the installation and maintenance of this type of equipment and related system components Installation and service personnel are required...

Page 2: ...3 2 to 3 Total Dissolved Solids PPM RP 316L SS 1000 MAXIMUM 1000 MAXIMUM 1000 MAXIMUM CR Super Alloy 3000 MAXIMUM 3000 MAXIMUM 3000 MAXIMUM Metals PPM 0 0 0 Free Chlorine MUST NOT EXCEED 5 PPM Occasio...

Page 3: ...cy resulting in the birth of a brain damaged or deformed child Pregnant women should stick to the 100 F 38 C maximum rule CAUTION 4 Before entering the spa or hot tub users should check the water temp...

Page 4: ...nvironments Due to its unsurpassed corrosion resistance this unique super alloy option is a true salt water product now available from Raypak for the most demanding of applica tions from high chlorina...

Page 5: ...Connections to the heat source plumbing should be made with 300 series stainless steel nipples Dielectric unions are recommended if dissimilar plumbing is used Connections to the pool system should be...

Page 6: ...ugh resistance to direct adequate flow through the heat exchanger and must be aug mented by using the manual valve to throttle flow to provide approximately 6 to 15 ft of head across the 995 exchanger...

Page 7: ...is Limited Warranty is the date of original installation if properly documented if you are not able to provide documentary proof of the date of original installation the Effective Date will be the dat...

Page 8: ...in any way by ANY persons or agencies other than those authorized by Raypak Raypak reserves the right at all times to inspect or require the return of the defective product or component part and to v...

Reviews: