WARNINGS 4
BEFORE INSTALLATION
Product Receipt
Model Identification
Ratings and Certifications
Installations at Elevation
Component Locations
General Information
GENERAL SAFETY
Time/Temperature Relationships in
Scalds
INSTALLATION
Installation Codes
Equipment Base
Stacking
Clearances
Combustion and Ventilation Air
Conventional Combustion
Air Supply
Water Piping
Hydronic Heating
Gas Supply
Electrical Power Connections
Field Wiring Connection
Venting
Changing the Flue Outlet
Venting Installation Tips
Venting Configurations
Outdoor Installation
Controls
Heater Sequence of Operation
Wiring Diagrams
START-UP
Pre Start-up
Start-Up
OPERATION
Lighting Instructions
To Turn Off Gas To Appliance
TROUBLESHOOTING
MAINTENANCE
47
Suggested Minimum
Maintenance Schedule
Preventive Maintenance Schedule
APPENDIX
Inside Air Contamination
WARRANTY 50
START-UP CHECKLIST
CONTENTS
3
APPROVED
UNCONTROLLED DOCUMENT IF PRINTED