SEQUENCE OF OPERATION
On call for heat, the D-2 Power Vent fan (and appliance pump) start. When the flow switch
circuits close, the ignition system consisting of an electronic spark module, pilot gas system and
flame sensor, are energized. When draft proving switch closes and all safety circuits are
proven, the automatic main gas valves will open and the heater will operate. When the
operating limit circuit is satisfied, the heater will shut down.
11
Dimensional Data
Model
A
B
C
D
181
18.13 12.38 7.88
4.25
182
18.13 12.38 7.88
4.25
185
18.13 12.38 7.88
4.25
260
18.13 12.38 7.88
4.25
261
18.13 12.38 7.88
4.25
265
18.13 12.38 7.88
4.25
330
17.50 15.75 7.63
6.00
331
17.50 15.75 7.63
6.00
335
17.50 15.75 7.63
6.00
400
17.50 15.75 7.63
6.00
401
17.50 15.75 7.63
6.00
405
17.50 15.75 7.63
6.00
Fig #9387