3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 GA150 MFD compatibility
The GA150 antenna is compatible with the following
Raymarine
®
LightHouse
™
MFDs:
•
a Series
a95 / a97 / a98 / a125 / a127 / a128.
•
eS Series
eS97 / eS98 / eS127 / eS128
Multifunction display software requirements
The operation of this product requires a Raymarine
®
MFD running LightHouse
™
software.
Raymarine
®
MFD variant
LightHouse
™
software
requirement
a Series
a95 / a97 / a98 /
a125 / a127 / a128
Version 11 or later
eS Series
eS97 / eS98 /
eS127 / eS128
Version 14 or later