background image

www.raycapsurgeprotection.com

©Raycap  •  All rights reserved

(320-0666)  Rev.B

Page 1 of 10

 

INSTALL INSTRUCTIONS        

DC12-48-60-0-25E

Contents

1 Copyright 

2

1.1 Disclaimer 

2

1.2 Warnings 

2

2 Introduction 

3

OVP Package Contents 

3

3.1 Prerequisites 

3

3.2 Tools 

3

Port Deinitions / OVP Deinitions 

4

Installing 2

"

 Conduit 

5

6  

Installing Alarm Cable / Coniguring alarm “daisy chain” 

5

7  

Installing Ground Cable 

7

Installing DC Trunk Cables  

8

 

 

(-48V power supply)

 

 

(-48V to tower / roof)

Summary of Contents for DC12-48-60-0-25E

Page 1: ...www raycapsurgeprotection com Installation Instructions DC12 48 60 0 25E INSTALL INSTRUCTIONS DC12 48 60 0 25E ...

Page 2: ......

Page 3: ...s 1 Copyright 2 1 1 Disclaimer 2 1 2 Warnings 2 2 Introduction 3 3 OVP Package Contents 3 3 1 Prerequisites 3 3 2 Tools 3 4 Port Deinitions OVP Deinitions 4 5 Installing 2 Conduit 5 6 Installing Alarm Cable Coniguring alarm daisy chain 5 7 Installing Ground Cable 7 8 Installing DC Trunk Cables 8 48V power supply 48V to tower roof ...

Page 4: ... continued progress in methodology design and manufacturing Raycap shall have no liability for any error damage of any kind resulting from the use of this document 1 2 Warnings Please read this manual prior to use to become familiar with the product s numerous features and operating procedures To maintain the maximum degree of safety follow the sequences as outlined Before using the product read a...

Page 5: ...uring Strikesorb SPD technology signiicantly enhance the reliability availability of the RRH site by providing superior electrical protection at the RRH and BBU and also enable lexible iber optic and power cable management solutions 3 0 OVP Package Contents 1 each OVP Enclosure 4 each Fitting 2 PVC Terminal Adapter Male 2 each Ground lugs 6 AWG with inspection port 3 1 Prerequisites This Document ...

Page 6: ... to 1 0 AWG Double lug ground 6 AWG Can be rotated vertically or horizontally Compression Lug 2 14 AWG 2 conduit Ground 0 2 0 39 wire Procedure Port Deinitions 4 1 See illustration to identify Base Port Assembly Deinitions Note Optional glands and inserts are included in hardware kit shipped with the DC12 48 60 0 25E OVP Deinitions 4 2 2 Conduit 2 Conduit Ground Ground ...

Page 7: ...TIONS DC12 48 60 0 25E Procedure Installing conduit 5 1 Open cover loosening the two screws on the front of unit 5 2 Install 2 conduit into the conduit ports on bottom of unit as needed Installing alarm cable 6 1 Connect wires according to your established color guide Connect alarm wires to alarm lugs ...

Page 8: ...hain 6 2 6 3 Alarm installation complete If less than 12 modules are powered disconnect termination loop of Daisy Chain and install into alarm wire assembly at the last powered module Position of termination loop for 6 module connection Typical alarm Daisy Chain when all 12 modules are powered Position of termination loop for 12 module connection ...

Page 9: ...m Raycap All rights reserved 320 0666 Rev B Page 7 of 10 INSTALL INSTRUCTIONS DC12 48 60 0 25E Procedure Installing ground cable 7 1 Feed ground cable through ground port and connect to ground lug 7 2 Ground installation complete ...

Page 10: ...66 Rev B Page 8 of 10 Procedure Installing DC trunk cable 48V power supply 8 1 Feed DC trunk cable through conduit port hole Connect wires according to AT T color guide Installing DC Jumpers 48V to tower roof 8 2 Feed DC trunk cable through conduit port hole Connect wires according to AT T color guide ...

Reviews: