SEE FIG. 15
NOTE:
PLEASE REMOVE PLASTIC PROTECTION ON
DOOR LININGS.
1.
Open the burner access door. Remove door and put in
a safe place.
(Rayburn 680KCD only).
2.
Remove 4 inner panel securing screws and remove
panel.
3.
Remove the 3 plinth securing screws and remove
plinth.
1.
Make electrical connections to terminal strip as wiring
diagram. (See Fig. 18).
1. Before connecting the flexible oil pipe to the pump
inlet, open the stop valve slowly and run off some of
the oil into a receptacle to establish an air free and
clean supply to the pump. Make the connection onto
the oil pump tight and leave valve open.
17
Installation Requirements
Fig. 15 - Rayburn 680KCD shown
DESN 515911
DESN 515623
DESN 515912
Fig. 16
Fig. 17
BURNER ACCESS
OIL PUMP
ELECTRICAL CONNECTION
TERMINAL STRIP
VACUUM
SUCTION
LINE
PRESSURE GAUGE
CONNECTION
PRESSURE
REGULATION
Summary of Contents for 680KCD
Page 16: ...Installation requirements 16 Fig 14 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE...
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...