Bust-a-
Move Frenzy ™
21 |
P a g e
Basic Functional Test on Initial Power Up
1.
Enter the Input Test and verify all switch inputs are working.
2.
Enter the Sound Test and verify the audio works and is not distorted.
3.
Enter the Light Test and verify that all the lights are working properly.
4.
Enter the Coin Meter Test and verify the coin meter is working properly.
5.
Enter the Watchdog Test and verify the game reboots.
6.
Upon a successful reboot, you are ready to adjust pricing, volume and other functions.
Summary of Contents for Bust-a-Move Frenzy
Page 2: ...This Page Left Blank Intentionally ...
Page 11: ...Bust a Move Frenzy 11 P a g e ...
Page 13: ...Bust a Move Frenzy 13 P a g e Note Install screen quadrants individually ...
Page 14: ...Bust a Move Frenzy 14 P a g e Marquee Power Supply ...
Page 15: ...Bust a Move Frenzy 15 P a g e Network Cable Connections Deluxe P7 ...
Page 51: ...Bust a Move Frenzy 51 P a g e Electrical and Mechanical Illustrations ...