Supplied By www.heating spares.co Tel. 0161 620 6677
SECTIONS:
TABLE OF CONTENTS
INTRODUCTION
2
3
4
5
6
7
8
9
10
11
GENERAL LAYOUT
Fig. 1
DESIGN PRINCIPLES AND
OPERATING SEQUENCE
TECHNICAL DATA
GENERAL REQUIREMENTS
INSTALLATION
COMMISSIONING
SERVICING INSTRUCTIONS
FAULT FINDING
ELECTRICAL SYSTEM DIAGRAM
EXPLODED PARTS DIAGRAM
LIST OF SPARE PARTS
PAGE:
6
6
8 - 9 - 1 0
11
16
25
30
43
45
47
48
.
KEY
1 - Heat exchanger
3 - Burner
4 - Ignition electrode
5 - Flue restriction ring
7 - Ignition board
9 - Detection electrode
11 - Frame
12 - Modulating gas valve
15 - Heating control
16 - Hot water control
30 - Water pressure gauge
17 - D.H.W. sensor
33 - Main switch
18 - Water pressure switch (heating circuit)
34 - C.H. Sensor
22 - Overheat cut off thermostat
36 - Fan
23 - Safety relief systems
37 - Expansion tank
24 - Three way valve
38 - Sealed chamber
26 - Auto air vent valve
45 - Combustion chamber
28 - Air pressure switch
50 - Flue gas exhaust hood
29 - Circulation pump
105 - Timer
4