![Ravenheat Little Star LS 100 Installation And Servicing Instructions Download Page 18](http://html1.mh-extra.com/html/ravenheat/little-star-ls-100/little-star-ls-100_installation-and-servicing-instructions_789123018.webp)
Supplied By www.heating spares.co Tel. 0161 620 6677
5.5
INSTALLINGTHE APPLIANCE FOR
REAR FLUE OUTLET
5.5.1
Use adhesive tape to attach the template
to the wall, making sure that the centre line
is vertical.
- Mark the two boiler fastening holes on
the wall as well as the centre of the flue
d u c t .
- Detach the template from the wall.
- Use a 10 mm. dia drill to make the 2 boil-
er securing holes. Insert the plastic
expansion plugs.
- Cut or core drill a 105 mm. dia hole for
inserting the flue duct.
- Screw in the two upper coach bolts leav-
ing them about 10 mm. out from the wall
to enable the boiler to be located on the
wall.
Fit the elbow header positioning it towards
the required direction (Fig. 30).
IMPORTANT: Make sure that the elbow’s
dia. 60 mm duct is inserted into the fan, the
rubber seal and orifice are been correctly
located.
Fig. 28
Fig. 29
1 9