MASTER SWITCH

The Switch Pro master switch toggles all section switches on or off. When the master switch is in the ON position, 

each section will function according to the corresponding section switch (see below for details). Toggle the master 

switch to OFF to turn off all boom sections manually.

NOTE:

If a remote master switch will be used with the Switch Pro, both master switches must be in the Off 

position to turn off booms. Toggling either the Switch Pro master or the remote Master will enable 

boom sections.

3-WAY SELECTABLE SECTION SWITCHES

Each of the 10 section switches can be toggled individually to one of three possible positions:
• ON - Manually control the section On. AccuBoom is disabled for this section and will not automatically turn this 

section Off based on AccuBoom or coverage maps.

• ACCU - AccuBoom control over this section is enabled. AccuBoom will automatically control this section based 

on AccuBoom and coverage maps. Refer to the Envizio Pro or Viper Pro Installation & Operation Manual for 

more information on setting up and using AccuBoom features.

• OFF - Manually control the section Off. This section will remain Off regardless of AccuBoom and coverage 

maps.

For sections not used by the Switch Pro, leave the corresponding section switch in the OFF position.

NOTE:

If auxiliary section switch hardware cannot be removed as described in the Preparation section on 

page 1, the auxiliary section switches must be in the Off position to allow Switch Pro to control boom 

functions properly.

USING ACCUBOOM OVERRIDE

Switch Pro provides simple operation of the AccuBoom feature on the Envizio Pro or Viper Pro field computer.
• AccuBoom control for each section is right at the operator’s finger tips.
• AccuBoom Override can be enabled for individual sections using the 3-way selectable section switches.

NOTE:

To override AccuBoom across all sections, use the AccuBoom override feature on the field computer. 

Refer to the AccuBoom sections of the Envizio Pro or Viper Pro Installation & Operation Manual for 

more information on using AccuBoom and the AccuBoom override feature.

Summary of Contents for Switch Pro

Page 1: ...Raven Switch Pro Installation Reference Manual Manual No 016 0171 219 Rev E 07 17 E29805 Copyright 2017...

Page 2: ...sible for any modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affec...

Page 3: ...ing Switch Pro 3 Logic Power LED 3 Increase Decrease Flow Switch 3 Master Switch 4 3 Way Selectable Section Switches 4 Using AccuBoom Override 4 Appendix A Switch Pro Combo Cable 5 Combo Cable Install...

Page 4: ...Table of Contents ii Raven Switch Pro Installation Reference Manual Coverage Map Issues 19 CAN Troubleshooting 19...

Page 5: ...er to the Best Wiring Practices section on page 4 section later in this chapter for more information If an existing Raven SCS 440 450 4400 system has not previously been installed prior to purchase of...

Page 6: ...ing hazards If the Switch Pro will be mounted together with an Envizio Pro or Viper Pro field computer Securely fasten the RAM mounting arm Envizio Pro to a suitable flat surface Once mounted the RAM...

Page 7: ...nt the Switch Pro either above or below the field computer Optional RAM Mount components are also available for remote mounting of the Switch Pro unit See the Switch Pro Kit Contents section on page 6...

Page 8: ...cable P N 115 0171 820 or 821 refer to Appendix A Switch Pro Combo Cable for installation instructions Refer to Appendix B System Diagrams for detailed system connection diagrams These drawings may b...

Page 9: ...ibration values programmed into the console These values are stored on the SCS console and must be programmed into the new console with the Switch Pro system See the Preparation section on page 1 for...

Page 10: ...1 1 1 1 Envizio Pro Console 063 0172 865 1 1 1 1 E Pro Switch Pro Mounting Bracket 107 0171 841 1 1 1 1 1 1 Power Ext Cable 115 0171 810 1 1 Switch Pro Console Cable 115 0171 803 1 Switch Pro Combo C...

Page 11: ...higher Refer to the field computer Installation Operation Manual for more information on software updates USING SWITCH PRO LOGIC POWER LED The logic power LED displays the status of logic power This...

Page 12: ...AccuBoom and coverage maps Refer to the Envizio Pro or Viper Pro Installation Operation Manual for more information on setting up and using AccuBoom features OFF Manually control the section Off This...

Page 13: ...make sure the cable is configured for the speed source being used with the Switch Pro system When using the Envizio Pro internal DGPS Receiver as the speed source make sure the T2 and T1 terminals ar...

Page 14: ...to SCS 440 450 cabling connect the 16 pin connectors on the existing console cable and combo cable If the speed and pressure sensors will be used reconnect the existing sensor cables to the Speed 14 p...

Page 15: ...o troubleshoot the Switch Pro system Be sure to locate the appropriate system diagram for the Switch Pro system currently installed SWITCH PRO FOR SCS 440 450 CABLED SYSTEMS The following diagrams ill...

Page 16: ...APPENDIX B 12 Raven Switch Pro Installation Reference Manual FIGURE 1 Envizio Pro with Switch Pro for SCS 440 450 Cabled Systems...

Page 17: ...13 FIGURE 2 Viper Pro with Switch Pro for SCS 440 450 Cabled Systems...

Page 18: ...Reference Manual SWITCH PRO FOR SCS 4400 CABLED SYSTEMS Refer to the following diagrams in reference to Switch Pro systems replacing an SCS 4400 console with the 117 0171 168 kits FIGURE 3 Envizio Pro...

Page 19: ...15 FIGURE 4 Viper Pro with Switch Pro for SCS 4400 Cabled Systems...

Page 20: ...anual SWITCH PRO COMBO CABLE TO SCS 440 450 SYSTEMS Refer to the following diagram when using the combo cable P N 115 0171 820 for SCS 440 450 Systems Kits 117 0171 169 or 170 FIGURE 5 Envizio Pro wit...

Page 21: ...17 FIGURE 6 Viper Pro with Switch Pro Combo Cable for SCS 440 450 Cabled Systems...

Page 22: ...ce Manual SWITCH PRO COMBO CABLE TO SCS 4400 SYSTEMS Refer to the following diagram when using the combo cable P N 115 0171 821 for SCS 4400 Systems Kits 117 0171 171 or 172 FIGURE 7 Envizio Pro with...

Page 23: ...19 FIGURE 8 Viper Pro with Switch Pro Combo Cable for SCS 4400 Cabled Systems...

Page 24: ...APPENDIX B 20 Raven Switch Pro Installation Reference Manual...

Page 25: ...ling if applicable Check CAN terminators Check for 12 volts on Switch Pro power connector Verify Envizio Viper Pro product control Configuration Product control must be set to CAN Boom valves do not t...

Page 26: ...up properly Check the boom setup on the console Nodes not completely programmed Check node calibration and ensure all calibration values are entered and correct The boom is disconnected Check the conn...

Page 27: ...no rate applied Cannot achieve target rate Driving too fast for vehicle Speed may exceed capabilities of vehicle to deliver product Slow the vehicle down during application or configure product contr...

Page 28: ...APPENDIX C 24 Raven Switch Pro Installation Reference Manual...

Page 29: ...i Combo Cable 5 Speed Input Terminal Configuration 5 Mounting Bracket iv Mounting Tips iv Preparation iii K Kit Contents 2 L Logic Power LED 3 M Master Switch 4 O Overview System 1 R Required Calibrat...

Page 30: ...Index 22 Raven Switch Pro Installation Reference Manual...

Page 31: ...r s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries...

Page 32: ...claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box...

Reviews: