OPERATIONS | CR7/CR12 | QUICK START GUIDE
PAGE 27/35 |
User manual
|
116-8000-017
|
Rev. B2
12
OPERATIONS
#
Beschrijving
Afbeelding
80
You will now be automatically redirected to
the operation when pre-planning is complete.
When a new operation plan needs to be
created, press the
“
right arrow
”.
81
Now press "operation planning".
82
Now press "operation planning
”
.
83
Enter a name for the field and the desired
working width.