background image

CaseIH 2100-2300 Series Combine SmarTrax Installation Manual

8

Installing the
Tank Port
Hose

Route new hoses up from the steering assist valve, between cab and support
plate, and then forward toward the steering orbital through the existing hole in
the cab support.  (This will follow existing hose routing to the orbital.)

1.

Remove the existing tank to orbital hose at the orbital and attach a
provided 13/16” tee fitting to the orbital.

2.

Re-connect hose to the tee fitting.

3.

Connect one end of the tank hose to the tee and one end to the “T”
port on the steering assist valve.

Helpful Hint:

  You may wish to install an elbow fitting on the

orbital or on the steering assist valve to properly route the hose.

Installing the
A-Port to Left
Steer Hose

1.

Remove the existing left steer hose at the orbital and attach a provided
13/16” tee fitting to the orbital

2.

Re-connect hose to the tee fitting.

3.

Connect one end of the “A to left steer” hose to the tee and the other end
to the “A” port on the steering assist valve.

Helpful Hint:

  You may wish to install an elbow fitting on the

orbital or on the steering assist valve to properly route the hose.

Summary of Contents for CaseIH 2100 Series

Page 1: ...Supplement Installation Manual CaseIH 2100 2300 Series Combine ...

Page 2: ...he effects of atmospheric conditions and sunspot activity on the performance of our products Raven Industries cannot guarantee the accuracy integrity continuity or availability of the GPS signal from the US Department of Defense NAVSTAR GPS satellites the OmniSTAR correction service or the WAAS correction service Raven Industries accepts no responsibility for the use of the signal for other than t...

Page 3: ... 016 0190 068 1 C H A P T E R INTRODUCTION Congratulations on your purchase of the Raven SmarTrax system This system is designed to provide cutting edge hands free steering of your machine via GPS coordinates ...

Page 4: ...ORFS F TO 9 16 JIC F 54 LG 214 1000 381 1 HOSE HYDRAULIC 9 16 ORFS F TO 9 16 JIC F 54 LG 214 1000 382 1 SWITCH PRESSURE MICRO H D 15 100 BAR ADJ W FTGS 422 0000 074 2 FITTING ADAPTER SWIVEL RUN TEE 13 16 ORFS 333 0012 028 2 FITTING ELBOW 90 SWIVEL 11 16 ORFS 333 0012 065 2 FITTING ELBOW 90 SWIVEL 13 16 ORFS 333 0012 067 2 FITTING ADAPTER SWIVEL RUN TEE 11 16 ORFS 333 0012 069 1 FTG ADAPTER STRT 9 ...

Page 5: ...ic system must be performed in accordance with the machine manufacturerer s approved maintenance instructions Raven Industries recommends that appropri ate protective equipment be worn when working on the hydraulic system Ob jects or materials that are able to bypass the machine s hydraulic filtration system will adversely reduce performance and possibly damage the hydraulic valves Do not reverse ...

Page 6: ... have any comments or suggestions for improvement please let us know by contacting our Customer Support Center by any of the following methods w Via phone 1 800 243 5435 w Via mail Raven Industries Flow Control Division 205 E 6th St Sioux Falls SD 57104 w Via email fcdinfo ravenind com Contacting Raven Industries ...

Page 7: ...of the machine 2 Drill holes in the support plate and attach the universal bracket using the provided mounting bolts 3 Align the proper holes on the bracket to those matching the holes in the hydraulic valve 4 Attach the Raven hydraulic valve to the top portion of the bracket using the two metric bolts provided Position universal bracket and valve in location shown ...

Page 8: ... 2100 2300 Series Combine SmarTrax Installation Manual 6 Pressure Switch 1 Connect pressure switch to PS port on steering assist valve Drill holes in support plate and attach hydraulic valve in position shown ...

Page 9: ...disconnecting hoses you may wish to trace hoses and label ports on hoses to ensure correct hose gets re connected to right ports on steering orbital This model of combine has ports labeled R P T L and LS stamped onto face of the orbital Refer to these during installation ...

Page 10: ...ing 3 Connect one end of the tank hose to the tee and one end to the T port on the steering assist valve Helpful Hint You may wish to install an elbow fitting on the orbital or on the steering assist valve to properly route the hose Installing the A Port to Left Steer Hose 1 Remove the existing left steer hose at the orbital and attach a provided 13 16 tee fitting to the orbital 2 Re connect hose ...

Page 11: ...isting pressure to orbital hose at the orbital and attach a provided 11 16 tee fitting to the orbital 2 Re connect hose to the tee fitting 3 Connect one end of the Pressure hose to the tee and one end to the P port on the steering assist valve Helpful Hint You may wish to install an elbow fitting on the orbital or on the steering assist valve to properly route the hose Installing the B Port to Rig...

Page 12: ...CaseIH 2100 2300 Series Combine SmarTrax Installation Manual 10 Notes ...

Page 13: ... Sensor to the right hand side of the machine in the approximate position shown 2 Connect non wired end of the sensor to the tie rod of the steering linkage 3 Connect the other end to the adjustable rear axle assembly Helpful Hint You may wish to weld the provided SPS bracket to the axle assembly or fabricate a new bracket to attach the SPS S P S ...

Page 14: ...CaseIH 2100 2300 Series Combine SmarTrax Installation Manual 12 Attach one end of SPS to tie rod Attach other end to rear axle assembly ...

Page 15: ... the wheels fully from side to side numerous times to remove air from the hydraulic system w Time the wheels for full left to right and right to left time of approximately 8 10 seconds Refer to the Universal Kit Manual for instructions on this w Adjust the pressure switch to the most responsive setting Refer to the Universal Kit Manual for instructions on this C H A P T E R START UP PROCEDURES ...

Page 16: ...CaseIH 2100 2300 Series Combine SmarTrax Installation Manual 14 Notes ...

Page 17: ...Manual 016 0190 068 15 ...

Page 18: ...CaseIH 2100 2300 Series Combine SmarTrax Installation Manual 16 ...

Page 19: ...to his distributor or to Raven for final approval WHAT WILL RAVEN INDUSTRIES DO When our inspection proves the warranty claim we will at our option repair or replace the defective part and pay for return freight WHAT DOES THIS WARRANTY NOT COVER Raven Industries will not assume any expense or liability for repairs made outside our plant without written consent We are not responsible for damage to ...

Page 20: ...ormation provided are the property of Raven Industries Inc and may only be used as authorized by Raven Industries Inc All rights reserved under the copyright laws Raven Industries Flow Controls Division P O Box 5107 Sioux Falls SD 57117 5107 Toll Free 800 243 5435 Fax 605 331 0426 www ravenprecision com fcdinfo ravenind com ...

Reviews: