![Raven Apache AS1040 Installation Manual Download Page 23](http://html.mh-extra.com/html/raven/apache-as1040/apache-as1040_installation-manual_788958023.webp)
Installation: Cable Installation
19
INSTALLATION
FIGURE 15. C9 Connector
9. Route the connector labeled to V4 Video and connect to the back of the field computer.
NOTE:
If necessary, use the tee for any video cables already connected.
OUTSIDE OF CAB
1. On the 115-2020-017 Main Harness Tee cable, locate the “TEE AT C9” connection and connect to the bulkhead
previously pushed through the floor below the cab of the machine.
FIGURE 16. Main Harness Tee Cable
Summary of Contents for Apache AS1040
Page 4: ...Table of Contents ii VSN Installation Manual for ET Apache AS840 850 AS1040 1050 AS1240 1250 ...
Page 8: ...CHAPTER 1 4 VSN Installation Manual for ET Apache AS840 850 AS1040 1050 AS1240 1250 ...
Page 26: ...CHAPTER 3 22 VSN Installation Manual for ET Apache AS840 850 AS1040 1050 AS1240 1250 ...