background image

ROS AccuBoom™ Calibration & 

Operation Manual

 Manual No. 016-1001-087 Rev. E      08/17               E29195

Copyright 2017

Summary of Contents for AccuBoom

Page 1: ...ROS AccuBoom Calibration Operation Manual Manual No 016 1001 087 Rev E 08 17 E29195 Copyright 2017...

Page 2: ...sible for any modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affec...

Page 3: ...Best Practices 6 Updates 7 Chapter 3 Calibration 9 AccuBoom Calibration Overview 9 Calibration 9 AccuBoom Look Ahead Settings 9 AccuBoom Settings Definition 10 AccuBoom Combo Node Configuration Tab 1...

Page 4: ...Table of Contents ii ROS AccuBoom Calibration Operation Manual...

Page 5: ...the AccuBoom components Be sure to keep safety labels in good condition and replace any missing or damaged labels To obtain replacement safety labels contact a local Raven dealer When operating the m...

Page 6: ...bundled and unbundled When installing harness secure it at least every 30 cm 12in to the frame Follow existing harness as much as possible and use these guidelines Harness should not contact or be at...

Page 7: ...lectrical components and connections with high pressure water High pressure water sprays can penetrate seals and cause electrical components to corrode or otherwise become damaged When performing main...

Page 8: ...rockets Deflection and backlash of belts and chains Adjustment zones of adjustable brackets Changes of position in steering and suspension systems Moving linkages cylinders articulation joints attachm...

Page 9: ...tional information on adding AccuBoom to an implement or fleet NOTE When used with a CAN product control system AccuBoom requires a boom speed node with program D or newer for proper AccuBoom operatio...

Page 10: ...ant zones may be added to the zone map later to modify the map as necessary AccuBoom will also assign a everything outside of the field boundary to a no spray or no plant zone Additional spray or plan...

Page 11: ...and the overall service we provide We appreciate the opportunity to see ourselves as our customers see us and are eager to gather ideas on how we have been helping or how we can do better To serve you...

Page 12: ...CHAPTER 2 8 ROS AccuBoom Calibration Operation Manual...

Page 13: ...ned for each product and the control hardware connected to the control system ACCUBOOM LOOK AHEAD SETTINGS The AccuBoom look ahead settings are used to adjust how far ahead of the current equipment po...

Page 14: ...ahead value for the implement application control system Refer to the On Look Ahead section on page 13 for recommendations for setting the on look ahead values 6 Enter the desired off look ahead value...

Page 15: ...dditional assistance Use Master Switch This option allows the system to display section status and field coverage based upon the section status reported by the AccuBoom node Leave this option disabled...

Page 16: ...urn On Look Ahead the system will delay the painting for one second when coming out of an applied area With a 5 second Turn Off Look Ahead the system will continue to paint for 5 seconds when coming i...

Page 17: ...on look ahead value is the time or distance ahead of the current section positions which the system will scan for activating section application Use the on look ahead value to adjust AccuBoom respons...

Page 18: ...r overlaps in coverage as desired NOTE The default value of 99 is set to virtually guarantee complete field coverage during field operations Depending upon the accuracy of GPS corrections being used a...

Page 19: ...or refilling stations or anytime a safe working distance has diminished If the equipment travels outside of the covered field area or the surrounding no spray zone if applicable AccuBoom will activate...

Page 20: ...the AccuBoom Override widget to display the AccuBoom Settings prompt 2 Select the Enable AccuBoom option to enable the AccuBoom feature ENABLE ACCUBOOM OVERRIDE To override all sections on for the co...

Page 21: ...Manual No 016 1001 087 Rev E 17 Operation ON SCREEN SWITCH BOX Refer to the ROS Basic Operation manual for information on configuring the On Screen Switch Box...

Page 22: ...CHAPTER 4 18 ROS AccuBoom Calibration Operation Manual...

Page 23: ...r s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries...

Page 24: ...claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box...

Reviews: