Raven 063-3001-002 Installation And Operation Manual Download Page 8

6

Master/Override Switch

The master switch toggles all section switches on or off. When the master switch 
is in the ‘ON’ position, each section will function according to the corresponding 
section switch (see the “3-Way Selectable Section Switches” below). Toggle the 
master switch to the ‘OFF’ position to turn all boom or implement sections off.

Hold the master switch to the ‘OVERRIDE’ position to temporarily override any 
sections controlled by an optional AccuBoom system on.

3-Way Selectable Section Switches

The section switches may be used to toggle up to ten individual sections. Raven 
field computers are also capable of controlling additional sections using the 
section mapping feature to group sections to the same switch. Refer to the field 
computer 

Installation and Operation Manual

 for additional information.

Note:  

Envizio Pro software version 3.5 or newer or a Viper Pro controlling an 
OmniSeed system are required to access section mapping. Contact a local 
Raven dealer for additional information.

Each of the ten section switches may be toggled individually to one of the three 
following positions:

• ON - manually control the section on. AccuBoom control of the section is 

disabled and will not automatically control this section based on coverage, zone 
maps or field boundaries.

• ACCU - AccuBoom automatic section control is enabled for the section. If 

installed and properly set up for the active job, the AccuBoom features will 
automatically turn sections on or off based upon previous coverage, zone maps 
or field boundaries created or active in the job.
Refer to the control console or field computer operation manual for more 
information about using the AccuBoom system.

• OFF - manually control the section off. This section will remain off regardless of 

AccuBoom control features.

Note:  

Leave the section switch in the off position for any sections not connected 
or controlled by the Raven control console or field computer.

Product Control Switches

Each of the five product control switches may be toggled individually to one of the 
three following positions:

• AUTO - The product rate will automatically be controlled by the product control 

console or field computer based on the vehicle speed and programmed target 
rate. Refer to the control console or field computer operation manual for 
information on programming a target rate for controlled products.

• MAN - The product rate must be manually controlled by the operator. The 

Raven control console or field computer will not adjust product rate based on 
vehicle speed or section status.

• OFF - The programmed product is off. Corresponding control valves, injection 

pumps or spinners will remain closed or will not run regardless of section or 
master switch changes.

Summary of Contents for 063-3001-002

Page 1: ...1 016 0171 467 Rev B 4 2015 E21066 Copyright 2015 CAN Switch Box Installation and Operation Guide ...

Page 2: ...en Industries shall not be held responsible for any modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affect the availability and accuracy of wireless and satellite navigation and correction services e g GPS GNSS SBAS etc Therefore Raven Industries cannot guarantee the...

Page 3: ...Decrease switch for quick application rate adjustments A Logic Power LED In addition to the above features the CAN Switch Box for use with OmniSeed systems offers implement control switches for raising and lowering the seed tube openers and controlling the down pressure on the shanks Care and Maintenance Refer to the following items when selecting a mounting location for the CAN Switch Box and Rav...

Page 4: ...alf clamps P N 107 0171 540 and 7 8 hex bolts P N 311 0049 104 At Raven Industries we strive to make your experience with our products as rewarding as possible One way to improve this experience is to provide us with feedback on this manual Your feedback will help shape the future of our product documentation and the overall service we provide We appreciate the opportunity to see ourselves as our ...

Page 5: ...o Pro or Envizio Pro II field computer so that the CAN Switch Box is mounted below the field computer 1 Set the mounting bracket over the mounting posts on the back of the field computer 2 Set the RAM mounting arm over the mounting plate and secure using four screws P N 311 0007 015 3 Align the CAN Switch Box with the remaining predrilled holes and secure using two lock washers P N 313 4000 007 an...

Page 6: ...rface cable to the CANbus port on the back of the CAN Switch Box 2 Connect the 2 pin Deutsch connector on the console or interface cable to the switched power port on the back of the CAN Switch Box 3 If connecting to a Viper Pro or Envizio Pro using the chassis interface cable P N 115 0172 001 connect the round 3 pin connector on the interface cable to the speed sensor port on the back of the CAN ...

Page 7: ...the Raven console or field computer is powered up troubleshoot the CANbus system before starting any system operations Increase Decrease Flow Switch Note The INC DEC switch only controls the selected product in automatic or manual mode Refer to the field computer or control console manual for more information on selecting products during application For selected products set to automatic control m...

Page 8: ...one maps or field boundaries ACCU AccuBoom automatic section control is enabled for the section If installed and properly set up for the active job the AccuBoom features will automatically turn sections on or off based upon previous coverage zone maps or field boundaries created or active in the job Refer to the control console or field computer operation manual for more information about using th...

Page 9: ... on the field computer are set to automatic or manual control the system will automatically shut off products and seed rate control sections when the shanks are raised If packing pressure control is set to off the openers switch will only raise and lower the shanks without changing product or section status Packing Pressure Override Switch The OmniSeed system allows an operator to set the target p...

Page 10: ...bus Check CANbus connector on CAN Switch Box Check CAN connections and cabling Check CAN terminator on end of CANbus line Check for 12 volts on switched power connector Console not set up for CANbus control Verify that the console or field computer product control configuration is set to CAN Boom valves do not turn on Faulty CAN high current power connection Verify high current HC power LED on pro...

Page 11: ...ously unapplied area and maintain a speed of at least 0 7 mph 1 1 km h Enable the Override feature on the control console or field computer Section status does not turn green ON when sections enabled Master switch must be toggled off at power up Cycle the master switch off then back on Sections not properly configured Verify section setup on the control console or field computer Nodes not programm...

Page 12: ...d computer or control console manual for more information about selecting valve type Incorrect valve setting Check valve or PWM settings Sectionswitches toggled on in zero rate zones Toggle the section switches to the ACCU or OFF positions Sections enabled but field computer not recording coverage Remote section switches left in the ON position Toggle all remote section switches to the off positio...

Page 13: ...are some common causes for communication failures Issue Possible Cause Solution Console or CANbus cannot find nodes Switch Box is not properly connected Check switched power connection Check the CANbus connection to the Switch Box and reinitialize the console to detect the Switch Box nodes Ensure console is powered on No power to Switch Box Check chassis cable power and ground connections Weak or ...

Page 14: ......

Page 15: ... the original owner and is non transferable HOW CAN I GET SERVICE Bring the defective part and proof of purchase to your Raven dealer If the dealer approves the warranty claim the dealer will process the claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the...

Page 16: ...nsible for damage to any associated equipment or products and will not be liable for loss of profit labor or other damages The obligation of this warranty is in lieu of all other warranties expressed or implied and no person or organization is authorized to assume any liability for Raven Industries Damages caused by normal wear and tear misuse abuse neglect accident or improper installation and ma...

Page 17: ... not have a serial tag the kit it came in must be registered instead WHERE CAN I REGISTER MY PRODUCT FOR THE EXTENDED WARRANTY To register go online to www ravenhelp com and select Product Registration HOW LONG IS THE EXTENDED WARRANTY COVERAGE PERIOD Raven Applied Technology products that have been registered online are covered for an additional 12 months beyond the Limited Warranty for a total c...

Page 18: ...and the claim itself Raven Industries will at our discretion repair or replace the defective product and pay for the standard return freight regardless of the inbound shipping method Expedited freight is available at the customer s expense WHAT IS NOT COVERED BY THE EXTENDED WARRANTY Raven Industries will not assume any expense or liability for repairs made outside our facilities without written c...

Reviews: