48 RE / DD / UM / RE-900 1.0-0
Chapter 6: Servicing:
6.1 Installation/Replacement of PCB:
Remove the screws of PCB, which has to be change and remove
the PCB from the mounting position and place the new PCB in that
same position as shown below.
Mounting position for Main Circuit board (RE – 900 – 16Z – MB):
Mounting Hole
Cable Entry Knock out
Mounting Hole
12V 12AH Battery
12V 12AH Battery
Summary of Contents for RE-900
Page 1: ...RE 900 Fire Alarm Control Panel Installation Commissioning Operating user Manual...
Page 5: ...4 RE DD UM RE 900 1 0 0 NOTES...
Page 11: ...10 RE DD UM RE 900 1 0 0...
Page 20: ...19 RE DD UM RE 900 1 0 0 2 6 Internal Arrangement...
Page 22: ...21 RE DD UM RE 900 1 0 0 Power Supply Board RE 900 PS...