background image

The Bluetooth link between the indicator and 

the carriage plate will connect automatically.

The iCP is “ACTIVE” when the blue LED on the 

plate flashes repeatedly.

3

After 5 seconds all electronics are warmed up and you can start weighing.

3.4  Switching off the system

1

2

e1

e2

e3

F1

F2

NET

ID CODE

PT

TOTAL

KG/LB

CLR

3 sec.

Switch off the indicator 

by pressing the on/off 

key for 3 seconds. 

The carriage plate will switch off automatically.

The blue LED “SLEEP” on the carriage plate will 

start blinking automatically.

      

      

USER MANUAL

 - 

iCP

 

      

      

USER MANUAL

 - 

iCP

 

6

7

Summary of Contents for iCP

Page 1: ...recyclable provided that parts are being processed and disposed of in the right manner More information can be found on our website www ravas com Rev 20220421 Printing Typographical errors and model...

Page 2: ...s or from negligent operation or assembly even if this is not expressly stated in this instruction manual In light of our policy of continuous improvement it is possible that details of the product ma...

Page 3: ...iCP 6 3 4 Switching off the system 7 3 5 Low battery indication iCP 8 3 6 Removing the rechargeable battery pack 8 3 7 Charging the battery pack 9 4 Cabled system system setup 10 4 1 Installing the i...

Page 4: ...coming into contact with the indicator in the cabin Any modifications done to the system must be approved in writing by the supplier prior to any work being completed It is the sole responsibility of...

Page 5: ...right side of the cabin mounted onto a side rail 3 on the dashboard Installation of the indicator bracket and support S13 1 2 S5 3 3 2 1 The indicator should be easy to reach and read Please note in...

Page 6: ...tion the battery pack in the battery holder until the red locking clip shifts up again 4 Close the battery holder until you hear a click 3 3 Connecting and switching on the iCP 1 2 e1 e2 e3 F1 F2 NET...

Page 7: ...ter 5 seconds all electronics are warmed up and you can start weighing 3 4 Switching off the system 1 2 e1 e2 e3 F1 F2 NET ID CODE PT TOTAL KG LB CLR 3 sec Switch off the indicator by pressing the on...

Page 8: ...ec The iCP will switch off automatically after 10 minutes FUNCTIONALITY BLUE LED DURING POWERING ON ON for 5 sec FULL BATTERY Flicker time interval Working mode Once every 1 5 sec Sleep mode Once ever...

Page 9: ...y capacity First position the battery pack inside the charger module then plug the adaptor into the mains voltage Smart charger When the battery is being charged the red LED on the charger is lit Afte...

Page 10: ...of the cabin mounted onto a side rail 3 on the dashboard Installation of the indicator bracket and support S13 1 2 S5 3 3 2 1 The indicator should be easy to reach and read Please note in this manual...

Page 11: ...abling example Connector of the iCP connected to the cable of the indicator Always install the cable neatly in a loop so that there will be no kink in the cable Indicator mounted in the cabin USER MAN...

Page 12: ..._ Black Red Blue Brown EU US READ LABEL ON BACK FOR POWER SUPPLY INDICATOR POWER REGULATOR INSIDE 12 VDC POWER CONVERTER INSIDE 20 100VDC Only possible if indicator is equipped with an integrated vol...

Page 13: ...n off key for 3 seconds 4 4 Connecting and switching on the iCP 1 2 e1 e2 e3 F1 F2 NET ID CODE PT TOTAL KG LB CLR Start up the indicator Press the on off key OR Switch on the iCP Move the iCP quickly...

Page 14: ...weighing min 10 C 15 F 0 0 max 40 C 105 F M1 3 5 min OK M1 After 3 to 5 minutes the load cells have reached the operational temperature Don t lift loads before the zero point correction has been execu...

Page 15: ...if 5 3 OIML OK if 2 Check the zero reading before each weighing Before each weighing it is necessary to check whether the system is unloaded and free If the indicator does not determine the zero poin...

Reviews: