V-09 05/2014
- 6 -
First time commissioning
close cabinet door
Press Start-key, Self test is run-
ning, remaining running time is
shown
Start
45:00
44:59
m
s
m
s
Start
When commissioning your new unit for the first time, you will be asked to start an automatic self test. The
duration of the self test is approximately 45 minutes and is necessary to adapt the unit to the specific envi-
ronmental conditions.
- Remove packing material from the interior cabinet. Check air baffle and racks for correct positioning and
fixing.
- Units 6X1/1, 10X1/1, 6X2/1 and 10X2/1 put a GN container (e.g. 7/8"/20 mm deep) upside down into the
center rail of the racks.
- Units 20X1/1 respec. 20X2/1 two GN containers have to be put into the mobile trolley of the unit. One con-
tainer each upside down to the center in front of each fan wheel.
- Cabinet door must not be opened during the complete self test
6X1/1 / 10X1/1 / 6X2/1 / 10X2/1 GN
20X1/1 / 20X2/1 GN
CAUTION
Fire hazard!
Remove packing material, starter kit
as well as containers and grids from
interior cabinet.
Summary of Contents for SCC WE 61G
Page 1: ...Installation Manual...
Page 42: ...V 09 05 2014 42...
Page 43: ...43 V 09 05 2014...
Page 44: ...80 05 082 V 09 Technical Services Md 05 2014 USA...