background image

Page 3

Back

Front

Panel 1

Panel 2

Face Plate

Description

Safety Guidelines

•  Save these instructions. This manual contains important instructions that will assist you during  installation and    

   for maintenance.

•  Keep all the components secure and protected during storage.

•  Be careful of finished surfaces during transport and installation to avoid damaging the finish. 

•  Installation and maintenance should only be performed by qualified electricians.

•  It is recommended a minimum of 2 people perform installation.

•  Do not install phone during extreme weather conditions.  

•  Do not touch uninsulated phone wires or terminals unless the phone line has been disconnected at the  

   network interface.

•   ADA compliant (hands free operation)

•   LED call status indicator

•   Powder coated steel construction inside and out 

•   Aluminum access panels powder coated inside and out

•   Weather and vandal resistant

•   Blue beacon and strobe 

•   Strobe turns on upon phone activation

•   Recessed illuminated face plate

•   Internal anchor base plate

•   Ability to program up to 5 emergency numbers

•   Remote or on-site programmable*

•   Panels secured with security screws

•   Torx bit provided to access panels

Features:

Height

9’

Width

10-3/4”

Depth

6”

Thickness of Steel

11 Gauge

Weight

167 lbs.

Tower Specifications:

*Not applicable for Cellular application

Tower Site Preparation Instructions

1.

 Concrete mounting pad should be at least 16” in depth and 2’ in diameter.

2.

 Insert the 3/4” x 12” galvanized rods per mounting template provided.

3.

 A minimum 2” of thread must be exposed above level of concrete.

4.

 Let concrete set for a minimum of 48 hours to cure.

Figure 1: Front & Back View

Summary of Contents for 2100-TPL Landline 120v Tower

Page 1: ...communications com RP8500040 Ver 8 04 21 36 Emergency Call Station Installation Operations Manual Emergency Tower Phone 2100 TPL Landline 120v Tower 2100 TPC Cellular 120v Tower 2100 TPV VoIP 120v Tow...

Page 2: ...st with site preparation installation and maintenance It is our sincere hope that your experience with us has and will continue to surpass your expectations Thank you for your business The RATH Team N...

Page 3: ...e operation LED call status indicator Powder coated steel construction inside and out Aluminum access panels powder coated inside and out Weather and vandal resistant Blue beacon and strobe Strobe tur...

Page 4: ...the concrete pad 2 Open lower Access Panel 2 on back of Tower see Figure 1 3 Feed the electrical and phone wires in the conduit into the Tower base through the 4 hole 4 Align the Tower mounting holes...

Page 5: ...ectly and has an active 4G data voice plan 4 A signal strength test is recommended Check the signal strength by using the built in network signal strength scanner To use the scanner function turn on S...

Page 6: ...rval is 1 minute A Press 8 Enter 3 digit number in minutes Ex 2 minutes 002 Step 5 To Exit Program Mode A Press Stop for 3 seconds Step 1 To Begin Program Mode A Call into phone by dialing the number...

Page 7: ...ested the phone If you answer NO to any question proceed to the Troubleshooting Section Push the emergency button on the front of the Tower Yes No RATH recommends the Tower be tested on a regular basi...

Page 8: ...providing a disconnect signal Contact the appropriate party to make sure the disconnect signal is provided When the called party hangs up busy signal is heard through speaker Phone company or phone s...

Page 9: ...Page 9 Wiring Strobe Wago Connector to front plate Phone line to communication source 1 4 5 7 8 0 9 6 3 2 Enter Record Play Pause Stop Constant Strobe 120v y r e t t a B r e m r o f s n a r T LN G...

Reviews: