2

INSTALLATION/ MOUNTING

Locate salt feed system within twelve feet (3.6 m) of
and on the same level as LST/MC treatment tank.
Make sure tank is accessible for refilling.  Secure salt
feed tank (Fig. #1).

PLUMBING

1. Drain and empty treatment tank for an existing

system.  If new system, perform following steps
before installing treatment tank.

2. Drill a 3/8" hole in treatment tank lid (Fig. #2).

3. Glue tank lid adapter (#31-325) in 3/8" hole

drilled in treatment tank lid using PVC cement
per PVC cement instructions.

4. Remove lid from salt feed tank by pulling sides of

lid up.

5. Remove packaging insert and unwrap salt feed

pump.

6. Place salt feed pump in hole at the end of  mounting

adapter located at the bottom of salt feed tank
(Fig. #5).

7. Install tubing from salt feed tank to check Valve

and to fitting on the Lectra/San treatment tank
lid.  Be sure arrow on check valve points toward
the Lectra/San treatment tank (Fig. #3).

8. Install overflow hose to bilge.

9. Connect pressurized freshwater with a shutoff

valve to the barbed nipple at the bottom of the
tank (Fig. #3).

10. Turn on water and check for leaks.

11. Fill tank with solar salt.

WIRING

WARNING:  Hazard of Electrical Shock.
Disconnect Power at source before proceeding.

1. Remove control module cover (#31-460) from

treatment tank.

2. Install heat sink (#EHST0220) on transistor (Q7)

located on the circuit board (Fig. #4), making
sure that the heat sink is not contacting any other
component.  The heat sink fits in only one position.

IMPORTANT:

A. Do Not use excessive force when installing the

Heat Sink.

B. Some components of the circuit board are

sensitive to static discharge.  Proceed using
care and observing antistatic precautions such
as grounding straps on wrist and touching
ground frequently to discharge body static.

3. Connect salt feed pump cable to LST/MC circuit

board (Fig. #4).  Connect red wire to terminal
U14 and black wire to terminal U15.

4. Replace control module cover and reconnect

electrical power.

LST/MC

Treatment Tank

Input
From

 Toilet

Shutoff Valve

Pressurized Fresh

Water Supply

Salt Feed System With Pump

Solar Salt

Solution

Overflow

Hose

Plumbed

To Bilge

Fig. #3 Four Gallon Salt Feed System With Pump Installation

Discharge to

Overboard or

Holding Tank

Wire to “Salt Feed”

Terminals on LST/MC

Circuit Board

Tubing

Check Valve

Tank Lid Adapter

(#31-325)

Drill 3/8"

Hole

4 1/2" (11.5cm)

1 3/4"

(4.7cm)

Fig. #2  Locating Hole in LST/MC Lid

Control Module

Cover (#31-460)