Raptor 2R User Manual Download Page 5

 

5

 

INSTALLATION

 

STANDARDS

 

 

Users

 

should

 

ensure

 

that

 

light

 

and

 

installation

 

materials

 

are

 

checked

 

for

 

regular

 

safety.

 

Unprofessional

 

incorrect

 

installation

 

can

 

be

 

dangerous. This Lighting fixture must be operated by professionals.Optimum temperatures for   

operation are 15-35 Degrees Celcius. When installing, dismantling or servicing the light, do not stand directly  
beneath the light. We advise that installed lights are serviced at least once a year and safety checks are carried  
out every 6 months. 

 

5.1

 

Installating

/R

igging

 

RAPTOR 2R

 

b e a m

 

moving

 

h e a d

 

lights

 

ca n

 

be

 

p l a c e d

 

on

 

the

 

stage

 

or

 

on

 

a

 

stand

 

in

 

any

 

direction. Quick

 

lock

 

system

 enables 

 
 
 
 

NOTE: Lights must have at least 50cm in between each light as   

Below. 

6

 

INSTALLATION

 

 
 

Your controller connects to the nearest input XLR, then from  
Output of the fixture connect to the input of the next one and   
so on. For long throws of DMX cable please connect a signal   
ender to the last fixtures out connection. 

 

The fixture to be installed/removed using the lighting hooks provided .

 

Note: must use two  clamps on fixtures, a n d  are 1/4 buckle fastening jig, only fully rotated 90

 

900mm

 

900mm

 

degrees clockwise to lock fastener.

 

5.2

 

Fixed

 

equipment

 

1.

 

Before installing fixtures ensure rigging equipment is not damaged and can bare at least 10 times the total weight of the lig ht, fixtures 

And accessories. 

2. Insert the lock hook fastener into the base mounting holes horizontally, turn 90 degrees to lock. To unlock reverse this p rocedure. 

3. Alwaysuse the safety rope when installing/rigging lighting to mounts or truss points 

 

 
 
 

 

 

NOTE: Add safety rope to the fixture base when installing, not the handles. 

 

fift 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3XLR

 

plug

 

1.Grounding

 

2.Signal-

 

3.

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Terminal

 

plug

 

connect

 

with

 

XLR

 

plug

 

second

 

or

 

third

 

by

 

a

 

0.25w

 

120ohm

 

resistor,

 

then

 

connect

 

the

 

resistor

 

into

 

last

 

light's

 

DMX

 

output

 

jack

 

2

 

Please

 

use

 

the

 

shielded

 

twisted-pair

 

cable,

 

standard

 

microphone

 

c able

 

can

 

not

 

be

 

reliably

 

controlled

 

long-distance

 

data.

 

 

0

 

7

 

 

0

 

8

 

Do not use two separate out connections. If the 

connecting amplifier connects in series as above. 

Please use shielded DMX Cable.   

Summary of Contents for 2R

Page 1: ...2R Moving Head Beam User Manual...

Page 2: ...pan and tilt with precise movement The applications of the RAPTOR 2R are endless giving versatility of use Main features include an Aluminium Gobo Wheel with 14 gobos plus open One frost wheel and a13...

Page 3: ...ual in its entirity as it contains important information such as installation using and maintenance DMX Channels 16 DMX512 CHs Power consumption 150w Control Model DMX512 Auto Sound Blue LED Screen Bu...

Page 4: ...t in box 5 Up to two crates stacked prohibited upside down 4 4 Unpacking 1 Open the box and bag handle 4 2 Transport protection locks In order to transport and to protect the lamp the body has two loc...

Page 5: ...t connection The fixture to be installed removed using the lighting hooks provided Note must use two clamps on fixtures and are 1 4 buckle fastening jig only fully rotated 90 900mm 900mm degrees clock...

Page 6: ...n error and the lamp does not strike please try re setting the light or lamp using the Built in menu IF problems still persist then please contact ROKHARV LED 9 FUNCTION 9 1Gobo wheel Metal gobo wheel...

Page 7: ...imes sec along with random strobe special features 9 6 Frost Frost is a piece of atomizing lens according to the actual control to complete the frost effect as your want 9 7 horizontal and vertical sc...

Page 8: ...ls7 Gobo 0 4 Open 5 9Gobo1 10 14Gobo 2 15 19Gobo 3 20 24Gobo 4 25 29Gobo 5 30 34Gobo 6 35 39Gobo 7 40 44Gobo 8 45 49Gobo 9 50 54Gobo 10 55 59Gobo 11 60 64Gobo 12 65 69Gobo 13 70 74Gobo 14 75 83Gobo 14...

Reviews: