SECTION 10: W
IRING
23 of 45
10.4 UHD[X][S] Series Ladder Wiring Diagram
IMPORTANT:
For field wiring into service junction box, or if any of the original wire supplied with the heater
must be replaced, it must be replaced with wiring material having a temperature rating of at least 221° F
(105° C) and 600 V. For supply connections, use No. 14 AWG or larger wires.