
Rapid Spray FieldLink Operators Handbook
Rapid Spray Equipment by Rapid Spray
14
HITCHING TO TRACTOR
Once your FieldLink has been fully assembled, it is ready to hitch to your tractor. Follow the
steps below:
1.
Align Tractor
Back the tractor up to the FieldLink with the left
and right tractor arms at the same height of the
mounting points on the FieldLink.
2.
Insert Pin Arms
Hook each tractor arm onto a mounting point and
secure it with a lock pin.
NOTE:
Please refer to tractor operating manual for
3-point locking system instructions.
3.
Insert Pin to Top Link
Hook up the top link to the third mounting point at
the centre of the unit and insert the correct sized
lock pin.
4.
Connect Pump
Connect the pump to the PTO shaft and hook
on the torque chain to keep the PTO shaft from
rotating with the pump rotation.
NOTE:
See pages 6 - 8 on correctly cutting and
fitting your PTO shaft.
WARNING:
PTO shafts are dangerous. Never work in
the vicinity of a PTO shaft while tractor is turned on.
5.
Test / Level Fieldlink
Using the tractors hydraulics, lift your sprayer off
the ground to ensure it has been secured properly
and is correctly aligned with the rear of the tractor.
Adjust tractor arms accordingly.