8. INSTALLATION
Check if the packing was damaged before opening. Make
sure no missed spare parts.
Safety Check
Make sure that the supply voltage corresponds to the
voltage indicated on the rating plate.
8.1 Motor Installation
8.1.1. Pump tube check: Make sure every joint part no looseness.
The coupling and shaft could be rotated flexible.
8.1.2. Motor Check: Make sure the power cable complete, switch
in good condition. Dry running for several minutes to check if
the motor workable. Do not put hands to the motor output
shaft.
8.1.3. Put the motor coupling is directed at the pump tube. Make
sure the pump tube head insert to the motor head completely.
8.1.4. The motor and pump tube position could be adjusted by
360°. Put the pump tube adjusted to the suitable position and
lock the nut to finish the installation. It is recommended that
the pump exports away from the motor power cable.
7. MOVING AND TRANSPORT
The pump tube and motor adopt the carton box packing. There is
enough protection packing material inside. However, never knock on,
heavy load by the non-normal external force. Please transport and
stacking as per packing indication. Keep drying and anti-corrosion of
the stacking place.
6. OPERATING CONDITIONS
6.1. Environmental Conditions
Electro-Motor operating environment: -25~40
캜
6.2. Power Supply
Make sure that the supply voltage corresponds to the voltage
indicated on the rating plate.
ATTENTION!
Power from lines with values outside the indicated limits can
damage the electrical components