Vector Solo Waterborne Applicators - Maintenance
42
Ransburg
7. Connect the 79727 Air Hose to main air.
8. Turn on main air and set the pressure so the
pressure gauge [2] in the 79870 Test and Main-
tenance Kit reads 25 psi (1.7 bar). The voltage
kV setpoint lever should be in the high voltage
position (down). The digital multi-meter should
read approximately 15 VDC.
Figure 74: Set Pressure Gauge to
1.7 BAR(25 psig)
9. If the voltage is outside this range, there is a
problem with the power module circuitry. If the
voltage range is acceptable the power module is
operating correctly, and there is an issue with either
the cascade or the wire connections leading to it.
AIR HOSE
MAINTENANCE
Air Hose - Ground Wire End
1. Cut the end of the air hose so that end is square.
2. Slide the sleeve and compression ring onto the
air hose end.
Figure 75: Sleeve and Compression Ring
3. Push the stem of the fitting all the way into the
into the air hose.
4. Slide the compression ring and the sleeve into
the fitting body and tighten.
Air Hose - Applicator End
1. Cut the end of the air hose so that end is square.
2.Install the 79930 fitting (std) or 79868 (qd)
into the hose end. Lightly lubricate the barb end
of the fitting with LSCH-0009 dielectric lubri-
cant. Push the fitting into the air hose up to the
threads on the stem.
Figure 76: Ground Fitting Insertion
Figure 77: Sleeve Tightening
Figure 78: Fitting Insertion
AH-08-03.6