background image

 

 

Installation: 

 

1. 

Align the spout (A) with the centre position of the handle lever on the valve 

 

2. 

Screw in the fixing stud (E) into the base of the tap (A) 

 

3. 

Pass the base column (B) over the fixing stud (E) to the base of the tap body (A) 

 

4. 

Place the upper seal (D) onto the base plinth (C), the place both these parts onto the base column (B) 

 

5. 

Screw the hot and cold flexible tail pipes (J&K) into the base of the tap body (A), note: the hot water should be connected to the left hand side of the 
tap when viewed from the front. 

 

6. 

Place the mixertap onto the sink or worktop and pass the tail pipes (J&K) and studded rod (E) through the taphole. With the tap in place check that 
the tail pipes (J&K) meet the hot and cold water feeds. If further adjustment to the plumbing is required do this now 

 

7. 

If fitting the tap to a stainless steel sink, the white triangular stabiliser (F) can be placed where shown to help to stabilise the weight of the tap. 

 

8. 

Pass the rubber gasket (G) and then metal horseshoe (H) over the fixing stud (E) and around tail pipes (J). 

 

9. 

Fasten the fixing nut (I) securely onto the fixing stud (E) fixing the tap into its correct location. 

 

10.  Connect the Hot & Cold water tail pipes (J&K) to the water supplies using ½” BSP x 15mm compression fittings or similar. 

 

 

 

Key: 

Description: 

Qty. 

 

Tap body 

 

Base column 

 

Base plinth 

 

Upper seal 

 

Fixing stud

 

 

White triangular stabilizer  
(for stainless steel sinks only) 

 

Rubber gasket 

 

Metal horseshoe 

 

Fixing nut 

 

Hot water flexible tail pipe 

 

Cold water flexible tail pipe 

 

Non return valves  
(integral to tail pipes) 

 

 
After installation: 

 

Once you have visually checked the installation of the new 
tap and all connections, ensure that all other fittings are 
closed except the new tap which should be left open.  
 
Turn on your water heating system and ensure that your 
mains stopcock is open. Reconnect both the hot and cold 
water supplies to this fitting. 
 
Check the function of flow and function of hot, cold and 
mixed water. 
 
Turn off the tap and check carefully for any leaks around all 
connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to 
double check for slower leaks. If pressure testing 
equipment is available check the installation to the 
maximum recommended pressure. 
 
Clean the tap to remove any marks created during 
installation as instructed then place a bag over the product 
to protect the tap until it is ready for use. 
 
The installation should be periodically checked for damage, 
if the property is left unattended for a prolonged period we 
recommend isolating water supplies. 
 

 

 

 

Reviews: