Rangemaster Belfast Bridge TBL1BF Manual Download Page 2

 

 

Installation: 

 
1.  Remove the plastic spout cap from the base of spout (A). Push the spout (A) down into body (B), and whilst pushing the spout 

down screw the collar at the base of the spout to fix it to the tap body (B). 

 
2.  Place the upper seals (E) over the hot and cold inlets (C & D) up to the base of the mixer tap (B). 
 
3.  Place the mixertap onto the sink and pass the inlet pipes (C & D) through the tapholes. With the tap in place check that the inlet 

pipes (C & D) meet the hot and cold water feeds. If further adjustment to the plumbing is required do this now. The hot water 
should be connected to the left hand side of the tap when viewed from the front. 

 
4.  Place the lower washers (F) over the hot and cold inlets (C & D) up to the underside of the sink. 

 

5.  Fasten the fixing nuts (G) securely onto inlets (C & D) fixing the tap into its correct location. 

 

6.  Connect the inlets (C&D) to the water supplies using ½” BSP compression fittings or similar. 

 

 

 

Key: 

Description: 

Qty. 

 

Mixertap spout 

 

Mixertap body 

 

½” Hot water inlet 

 

½” Cold water inlet 

 

Upper sink seal 

 

Lower washer 

 

Fixing nut 

 

 
After installation: 

 

Once you have visually checked the installation of the new 
tap and all connections, ensure that all other fittings are 
closed except the new tap which should be left open.  
 
Turn on your water heating system and ensure that your 
mains stopcock is open. Reconnect both the hot and cold 
water supplies to this fitting. 
 
Check the function of flow and function of hot, cold and 
mixed water. 
 
Turn off the tap and check carefully for any leaks around all 
connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to 
double check for slower leaks. If pressure testing 
equipment is available check the installation to the 
maximum recommended pressure. 
 
Clean the tap to remove any marks created during 
installation as instructed then place a bag over the product 
to protect the tap until it is ready for use. 
 
The installation should be periodically checked for damage, 
if the property is left unattended for a prolonged period we 
recommend isolating water supplies. 
 

 

 

 

Reviews: