background image

2

    www.macdonaldindustries.co.nz

NOTES

•  Inspect all items thoroughly immediately on receipt to ensure it meets  

your requirements.  

•  Inspect product for defects prior to installation. MacDonald Industries will  

not be responsible for any claims related to replacements after a product has 
been installed.

• Ensure wall support bracket has been installed to the correct height as required 
   to meet the contract specification and NZ Building Code G1.
•  Check water pressure does not exceed 500kPa. Fit pressure reducing valve  

if necessary.

• Check water inlet / waste outlet positions are correct for the WC supplied 
   according to the measurements in Dia. 1.
• All measurements provided are based on finished wall/floor. 
• Installation must only be completed by a registered plumber in accordance with 
   AS/NZS3500 requirements.
• Correct wall support for any wall hung WC is essential and is totally the 
   responsibility of the contractor. MacDonald Industries will not accept any claim 
   for damages caused by inadequate wall structures, materials or incorrect  
   support for the WC.

Dia 1

337

440

15

0

340

400

180

13

5

10

0

30

65

315

525

Reviews: