20
Raita
PA bio - biokem
MANUAL - INSTALLATION
Content of the delivery, connercting etc
Piping, ventilation
Electricity
Installation posibilities
Installation in the ground
Other things ground installation
Anhcoring the tanks
Other thing ground installation
Content of the delivery:
1) Pre-treatment and process wells. They are
connected with all in, out, middle pipes ready.
2) technology (pumps, piping, level switch, pressure
sensor), technology box - electric central and sludge
collection tank (or sludge drying equipment) are coupled
to the treatment plants at installation site
Coupling:
The coupling of equipment to the treatment plant
takes time about 1-2 hours by a plumber installer.
There are more connection instuctions included in the
delivery for respective model.
If necessary, the coupling can be in connection with
the treatment plant's start up (see below) for extra cost.
Start up / inspection of installation:
The delivery includes a start up and inspection of
installation. During start up, treatment plant's function and
use is schooled to the customer.
Another inspection over one year's time is also included
in the delivery.
Service agreement / monitoring:
We have service contracts for the customer, which
are performed usually by the local partner.
The service agreement may also include some or all
of the maintenance of the treatment plant. The
waste water plant can also be connected to the RRC
(Raita Remote Controller) system with automatic follow up.