![RAIS POLEO Instructions For The Use Download Page 7](http://html1.mh-extra.com/html/rais/poleo/poleo_instructions-for-the-use_3531106007.webp)
ENGLISH
RAIS manual for Rais Poleo and Rais Epoca
7
The stoves are equipped with cool door handles a Rais special feature which means
you could almost do away with gloves. Be aware, however, that all exterior surfaces
become hot during use so take extreme care.
Convection
Rais stoves are convection stoves. This means that the stove’s back and side panels are
not overheated. Convection means that there is a circulation of air, which ensures that
the heat is distributed more evenly throughout the entire room. The cold air is sucked in at
the base of the stove and up through the convection channel, which runs along the
stove’s combustion chamber. The heated air comes out at the top of the stove, which
ensures a circulation of warm air throughout the room.
Chimney
In order for the stove to perform satisfactorily the chimney height must be sufficient to
ensure an adequate draught of approximately 15 Pa so as to clear the products of
combustion and prevent smoke problems into the room.
NOTE: A chimney height of not less than 4.5 metres measured vertically from the outlet of
the stove to the top of the chimney should be satisfactory. Alternatively the calculation
procedure given in EN 133841 may be used as the basis for deciding whether a
particular chimney design will provide sufficient draught.
The outlet from the chimney should be above the roof of the building in accordance with
the provisions of Building Regulations Approved Document J.
If installation is into an existing chimney then it must be sound and have no cracks or
other faults which might allow fumes into the house. Older properties, especially, may
have chimney faults or the cross section may be too large i.e. more than 230 mm x 230
mm. Remedial action should be taken, if required, seeking expert advice, if necessary. If it
is found necessary to line the chimney then a flue liner suitable for solid fuel must be used
in accordance with Building Regulations Approved Document J.
Any existing chimney must be clear of obstruction and have been swept clean
immediately before installation of the stove. If the stove is fitted in place of an open fire
then the chimney should be swept one month after installation to clear any soot falls
which may have occurred due to the difference in combustion between the stove and the
open fire.
If there is no existing chimney then any new system must be to the designation
described above and in accordance with Building Regulations Approved Document J.
A single wall metal fluepipe is suitable for connecting the stove to the chimney but is not
suitable for use as the complete chimney. The chimney and connecting fluepipe must
have a minimum diameter of 150 mm and its dimension should be not less than the size
of the outlet socket of the stove.
Summary of Contents for POLEO
Page 2: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 2...
Page 13: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 13...
Page 15: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 15...
Page 16: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 16...
Page 30: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 30...
Page 31: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 31...
Page 32: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 32...
Page 33: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 33...
Page 34: ...ENGLISH RAIS manual for Rais Poleo and Rais Epoca 34...