background image

www.RainbowAtticStair.com

By SP Partners, LLC

INSTALLATION GUIDE 

ProTech-12 

Summary of Contents for ProTech-12 Series

Page 1: ...www RainbowAtticStair com By SP Partners LLC INSTALLATION GUIDE ProTech 12...

Page 2: ...or to ceiling height MUST be attached See TABLE A page 3 Stop Bolt arm MUST be set before climbing stair This adjustment provides structural support necessary for use See page 7 Failure to follow any...

Page 3: ...same dimensions as joists keyhole saw or utility knife to cut ceiling material 8 3 8 Hex Nut 4 3 8 Threaded Rod 4 Joist Hanger Parts Included Tools Materials Required 1 Door Hook 1 Wood Pole 2 1 2 Wo...

Page 4: ...the chosen location allows sufficient projection and landing space for your unit See Figure 1 below and TABLE A above Figure 1 Locating the Stair MODEL COLOR ROUGH OPENING FRAME DIMENSIONS TREAD WIDT...

Page 5: ...e installed parallel to the ceiling joists Figure 3 In cases where they are installed perpendicular to joists Figure 4 some joists will need to be cut and tied in to other joists with 2 x 6 or 2 x 8 h...

Page 6: ...ully Figure 5 Square stair to frame and tighten nuts in stages Do not over tighten as this may distort metal trim Attach door opening hook to wood dowel using 2 1 2 wood screws Figure 7 Door can now b...

Page 7: ...ble A on page 4 If no additional steps are needed skip this section 1 With stair fully extended to floor detach bottom step by removing the four bolts washers and sleeves Figure 8 This tread will be a...

Page 8: ...p Bolt Remove bottom tread Add extra tread s Loosen stop nut on side of stair both sides and ensure that stair is touching the ground Slide bolt up wards until it stops and re tighten This will keep t...

Page 9: ...s of the product for a particular purpose All such implied warranties including those of merchantability and or fitness for a particular purpose are excluded and disclaimed Furthermore all claims for...

Reviews: