
3. Initial inspection
Immediately upon receipt of your shipment:
1. Open shipping carton(s). Solar panel and radio frequency (RF) items (if any) may be packed
in a separate box.
2. Set the large weather station carton down lengthwise on a floor or table top.
3. Position the box as shown in
4. Cut the tape along the edge of the lower flap first (
(p. 3)).
FIGURE 3-1. Cut flap packing tape
5. Cut the tape around the remaining flaps ensuring to only cut one layer deep.
6. Lift up the cardboard flaps exposing the top layer of foam (
FIGURE 3-2. Shipping box packaging
Section 3. Initial inspection
3
Summary of Contents for WS-PRO2
Page 9: ...FIGURE 3 4 WS PRO2 bottom layer Section 3 Initial inspection 5...
Page 113: ......