
Conduit and associated tools (as required)
Felt-tipped marking pen
Claw hammer
Pipe wrench, 305 mm (12 in)
Handheld drill/driver with 10 mm (3/8 inch) hex driver bit
Drill with 6 mm (7/32 in) drill bit
4.2 Supplies for power and communications
options
AC Power
Wire, conduit, and junction boxes as needed (
(p. 8)).
FIGURE 4-1. WS-PRO2 pole installation with currently-available AC power option
NOTE:
User supplies valve box at base of station and weatherproof enclosure for transformer
(
Section 4. QuickStart
8
Summary of Contents for WS-PRO2
Page 9: ...FIGURE 3 4 WS PRO2 bottom layer Section 3 Initial inspection 5...
Page 113: ......