background image

 

 AlphaBlower 2200 

Manual 

 

 

 

January 2020 

 

 

 

 

 

 

 

 

 

Summary of Contents for 55-001

Page 1: ...AlphaBlower 2200 Manual January 2020 ...

Page 2: ...RadonTec GmbH Hauptstraße 5 89426 Wittislingen Germany Tel 49 9076 919 98 35 E Mail info radontec de Website radontec de Shop radonshop com Version 01 1 19 01 2020 ...

Page 3: ...Intended use 6 4 2 Installation instructions 7 4 3 User groups 12 5 LED display warning signals 14 5 1 Green 14 5 2 Yellow warning tone Service interval reset 15 5 3 Red warning tone Cleaning 15 6 Symbols 17 7 Declaration of Conformity 18 8 Warranty 19 9 Support and Contact 20 9 1 Troubleshooting FAQ 20 9 2 Contact Us 20 ...

Page 4: ...s suitable for installation in a vacuum pipe system for pumping radon to reduce radon contamination in buildings 2 Accessories The scope of delivery of the AlphaBlower 2200s includes the following individual parts AlphaBlower 2200 Wall mount Power supply unit Cable ...

Page 5: ...ing material 3 Technical overview Suction unit Radon Voltage 1 phase safety transformer 120 VA 27 VAC 230 V 50 Hz Power 70 W Max Vacuum 2200 Pa Max Flow rate 130 m h Overvoltage protection Noise level at 1m distance 40 dB A Dimensions LxWxH 360 x 320 x 200 mm ...

Page 6: ...uilding To reduce condensation problems the AlphaBlower 2200 and the corresponding piping should be mounted in heated areas or the piping must be insulated Care must be taken to prevent condensate from running back into the unit Condensate running back will damage the AlphaBlower 2200 The AlphaBlower 2200 may only be used at room temperature and indoors The device must be protected from excessive ...

Page 7: ...7 Manual AlphaBlower 2200 4 2 Installation instructions 1 Fix the wall bracket to the wall with four screws 2 Insert the AlphaBlower 2200 into the holder 4x ...

Page 8: ...8 Manual AlphaBlower 2200 3 Fix the AlphaBlower 2200 in the holder with 4 screws 4 Installation radon well 4x Ø 40 60 cm ...

Page 9: ... sockets or adapters approved for this purpose Check that the mains voltage matches the connected load of the aspirator Do not use the cable for purposes for which it is not intended Following the installation the radon concentration must be measured and a maintenance cycle must be set ...

Page 10: ...10 Manual AlphaBlower 2200 6 Possible design variant ...

Page 11: ...nual AlphaBlower 2200 Delivery rate m3 h Fan characterist ic Vacuum Pa 7 Set By pressing the Plus key the air volume flow can be increased The air volume flow can be reduced by pressing the Minus key m h ON ...

Page 12: ...r groups Installation and assembly of the unit Qualified personnel with technical training Technical trainees under the guidance and supervision of a qualified specialist Electrical connection Replacement of electrical spare parts Electrician Technical trainees under the guidance and supervision of a trained specialist Determination of maintenance intervals Specialist ...

Page 13: ...ized specialist If the connecting cable is damaged it must be replaced by a specially prepared connecting cable Faulty installation can lead to increased radon concentration The installation must be tight Seal screw connections and cracks in the base plate Improper use can lead to respiratory problems suffocation poisoning or cancer Exhaust air must not be directed into used areas e g near a terra...

Page 14: ...phaBlower 2200 5 LED display warning signals The control panel of the AlphaBlower 2200s provides status information via 3 LEDs 5 1 Green The green LED indicates that power is being supplied to the AlphaBlower 2200 ...

Page 15: ...multaneously while switching on the AlphaBlower 2200s until the red and yellow LEDs light up and the warning tone sounds After resetting the service interval time the new time interval starts counting down from 9000h 5 3 Red warning tone Cleaning The red LED with warning tone indicates that the air supply or air discharge is blocked The AlphaBlower 2200 must be cleaned After 5 minutes the aspirato...

Page 16: ...ncreased pollutant load of the ambient air is to be expected If the suction performance is impaired by deposits in the piping system contaminated parts must be replaced Only original spare parts are to be used for this purpose Repairs may only be carried out by recognized specialists For more details refer to chapter 5 3 User groups Finally reset the alarm by pressing the key for 5 seconds The gre...

Page 17: ...f power tools in household waste According to the European Directive 2012 19 EU on waste electrical and electronic equipment and its implementation in national law used electrical tools must be collected separately and recycled in an environmentally friendly manner Dirty filters must be treated as hazardous waste Dispose of replaced device parts filters or old devices in accordance with the the re...

Page 18: ...visions of the following directives 2014 30 EU 2014 35 EU 2011 65 EU Applied harmonized standards DIN EN 60335 1 2012 10 DIN EN 60335 2 45 2012 08 DIN EN 62233 2008 11 2009 04 DIN EN 55014 1 2012 05 DIN EN 55014 2 2009 06 DIN EN 61000 3 2 2015 03 DIN EN 61000 3 3 2014 03 DIN EN 50581 2013 02 Wittislingen 2016 02 24 ...

Page 19: ...pt of the product Contamination due to dirt or improper use is not covered by the warranty During the warranty period the product will be repaired or replaced at no charge Exclusions This warranty does not cover damage caused by abuse neglect or misuse This includes damage caused by drops impacts or penetrations It is also void if the product has been repaired or altered by another EIC Inc To obta...

Page 20: ...d questions on our website https www radontec de 9 2 Contact Us Should you have any further questions or require further help and technical support please do not hesitate to contact us RadonTec GmbH Hauptstraße 5 89426 Wittislingen Germany Tel 49 9076 919 98 35 E Mail info radontec de Website radontec de Shop radonshop com ...

Reviews: