53
Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
Situation 2:
In this situation, the smoke pipe has to go at least 1.5m vertically up in the room with
the stove and then burst through a wall and to be connected to the chimney.
The smoke pipe has to have the condensation T-piece where it exits the stove as well
as the possibility to be disassembled in order to be cleaned.
WARNING: Not following the rules while setting up smoke channels and the
chimney, may lead to improper operation of the stove, and endanger human
health and even their lives. The greatest danger is from poisonous gases which
are the products of combustion. In these situations, where the smoke pipe and
chimney, as well as the air supply, aren’t executed according to the manual,
Radiator inzenjering can’t take any responsibility for the unwanted
consequences.
Picture 9. The representation on how to install smoke channels