2
R2KA 24 /20 - RAD - ING - Manuale - 1806.1_SK.2
R2
K
A
24
.2
0_
E
N
SUMMARY
SUMMARY
INTRODUCTION
4
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. OVERALL DIMENSIONS
11
1.1.6. JIG
11
1.1.7. POSITIONING AND MINIMAL TECHNICAL SPACES
12
1.1.8. CIRCULATOR PREVALENCE/FLOW DIAGRAM
13
1.1.9. HYDRAULIC CONNECTION
14
1.1.10. D.H.W. CIRCULATING LOOP
15
1.1.11. SYSTEM FILLING
16
1.1.12. FILLING THE CONDENSATE COLLECTION SIPHON
17
1.1.13. ANTI-FREEZE PROTECTION
18
1.1.14. GAS CONNECTION
19
1.1.15. ELECTRICAL CONNECTION
19
1.1.16. POWER SUPPLY
20
1.1.17. OPTIONAL ELECTRICAL CONNECTIONS
21
1.1.18. FUME EXHAUST FITTINGS
23
1.1.19. INSTALLATION MODES
24
1.1.20. TYPES OF FUME EXHAUST SYSTEMS
26
2. SUPPORT CENTRE SECTION
29
2.1. FIRST START-UP
30
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
30
2.1.2. BOILER COMMISSIONING
31
2.1.3. CO2 VALUE CHECK AND CALIBRATION
32
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
33
2.1.5. DIGITECH CS PARAMETERS TABLE
35
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
42
2.2. MAINTENANCE
43
2.2.7. GENERAL MAINTENANCE WARNINGS
43
2.2.8. TECHNICAL DATA
45
2.2.9. TECHNICAL ASSEMBLY
50
2.2.10. HYDRAULIC BOARD
51
2.2.11. 3-WAY VALVE OPERATION
52