radiance SC-Plus Installation & Operation Instructions Download Page 7

The mounting kit included in this box contains: 

Part A: 2x mounting handles        Part B: 2x mounting handles        Part C: 8x screws        Part D: 8x wing nuts        

Part E: 4x wall/ceiling anchors 

 

Step 1: Slide the mounting handles (part A) into the rail on the back of the heater from the opposite side of the 

cables. Make sure both handles face into the same direction. 

 

Step 2: Drill four holes into the wall/ceiling, two for each mounting handle (part B). Use the mounting handles as 

stencils and level them to make sure the heater will hang straight on the wall/ceiling. You can chose the distance 

between the two handles to your liking but make sure the distance doesn't exceed the length of the heater. 

Remove the nut form the wall/ceiling anchors (part E) and place the wall/ceiling anchors into the drilled wholes.  

Step 3: Place the mounting handles (part B) onto the wall/ceiling anchors and secure them with the wall/ceiling 

 

Step 4: Place the heater against the wall/ceiling and attach each of the mounting handles that are mounted on the 

wall (part B) with the mounting handles attached on the heater (part A). Secure them with two screws (part C) and 

two wing nuts (part D) on each side. Chose the mounting holes according to the way you want the heater to be 

directed.    

Step 5: Finally secure the mounting handle (part A) to the heater using two screws and two wing nuts on each 

side. Make sure everything is safely mounted and secured.  

7

Summary of Contents for SC-Plus

Page 1: ...mmercial Heaters EN Panels covered by these instructions are listed in the table below Model Power Size Weight Mounting Build in thermostat receiver IP Protection SC1800 Plus 1800W 137 16 12cm 7Kg Wal...

Page 2: ...epresents a new generation of infrared panel heaters equipped with a built in thermostat receiver inside of the junction box Artcile Number Receiver01 on the backside of the panel It needs to be used...

Page 3: ...all children should be kept away from the heater unless constantly supervised Do NOT operate the heater in small rooms when occupied by people not capable of leaving the keep out of reach of children...

Page 4: ...could cause scratches or other irreparable damage Before operating the heater again it must be completely dry 4 2 Using Working Please note that the heater may discolour with use This is due to airbo...

Page 5: ...ower switch of Receiver01 on double Receiver01 will only be commanded by the Smart controller Note After the paring process and once Receiver01 and Smart 1 0 Smart 1 0Pro Smartplug are paired the pair...

Page 6: ...s a surface temperature of special attention and mount them out of reach On the left see the drawing of the mounting requirements When installing the space heater to a ceiling or wall please make sure...

Page 7: ...liking but make sure the distance doesn t exceed the length of the heater Remove the nut form the wall ceiling anchors part E and place the wall ceiling anchors into the drilled wholes Step 3 Place t...

Page 8: ...nce shall not be liable for any other occurring costs such as installation cost or any other consequential losses however incurred Please note that tampering with or opening the heater in any way will...

Page 9: ...mum heat output elmin 0 0 kW Single stage heat output and no room temperature control No In Standby mode elSB 0 001 kW two or more manual stages no room temperature control No with mechanic thermostat...

Page 10: ...Serial number of your Radiance infrared heater is 10 info theheatingcompany co nz www theheatingcompany co nz The Heating Company Ltd 117 Wairau Rd Wairau Valley Auckland 0627 New Zealand...

Reviews: