Page 1: ......
Page 2: ......
Page 3: ...itten consent or in circumstances that may cause us commercial harm The operation of this equipment requires training and experience in electric meter testing The information in this Operations Manual...
Page 4: ...etting Started 7 2 1 1 Thank You for Your Purchase 7 2 1 2 Preparing Equipment for Use 7 2 2 Operational Considerations 8 3 Product Features 9 4 Operations Overview 11 4 1 Meter Programming and Meter...
Page 5: ...ollowing tasks Power up form 2S 12S and 25S meters 3 Amps or 30 Amps Load Delivered and Received Energy Meter Disconnect testing 1 0 Product Introduction and Specifications 1 1 Product Overview The WE...
Page 6: ...ightweight for desktop use No software required 1 3 Safety Information Review the information in this section to avoid injury and prevent equipment damage The WECO 300 was designed with safety in mind...
Page 7: ...reaches you in perfect condition Your satisfaction is very important to us and your continued loyalty is greatly appreciated If for any reason your Radian product does not meet your expectations of ex...
Page 8: ...top Meter Test Station and ensure optimal performance follow these guidelines When placing the WECO 300 Desktop Meter Test Station for use avoid wet or dusty environments If the equipment is exposed t...
Page 9: ...d current can be applied You can lift the handle and reposition the operating position to your preference By depressing the handle top button the handle can be oriented to an alternative position B Me...
Page 10: ...will illuminate when the WECO 300 detects that the meter disconnects are closed Note LEDs will remain illuminated if the Current Switch is ON For the LEDs to go out the disconnect must be open AND th...
Page 11: ...read meter registers Manually read meter registers using the meter display For meter accumulate energy apply current to meter with Current On switch and select the desired load 4 2 Delivered and Recei...
Page 12: ...r with Voltage On switch Verify Disconnect closed LEDS are illuminated for elements A and C Open disconnect using meter manufacturer supplied software Verify Disconnect closed LEDs are not illuminated...
Page 13: ...service contact Radian Research Inc Radian Research Inc 3852 Fortune Drive Lafayette IN 47905 USA Tel 765 449 5500 Fax 765 448 4614 Email technicalsupport radianresearch com Website www radianresearc...
Page 14: ...Inspect the unit and power cable for any damage Monthly or after every 500 meters Clean the surface area of the Meter Socket using a soft brush or a paint brush Remove all dust dirt and grime Check th...
Page 15: ...or pitted Look for signs of wear The voltage pins of the socket require minimal maintenance Clean the pins using a soft cloth moistened with isopropyl or denatured alcohol Apply light pressure while...
Page 16: ...order or credit card is required The owner must pay all shipping costs If requested Radian Research Inc can provide an estimate for the repair However if the repair is not made the cost of labor requ...