Bantam Plus Getting Started Guide v6
31
Radian Research, Inc.
4.
Bantam Plus will implement an initialization sequence. Before
proceeding with a meter test validate the Kh is correct for the meter
under test. The optics should now be aligned.
5.
Figure 10
Bantam Plus Meter Testing Screen
The integrated „Sensor Pro‟ is designed to
accommodate meters with very low level pulse
emission or during operation in bright sunlight. For
optimal sensitivity position sensor head 1 inch
between the Meter glass and the sensor. Use the
target on the Sensor Pro to assist in alignment.
6.
The integrated „Sensor Pro‟ is assigned to Optics 2 (Port 2). Select
„Adjust Optics‟ button from the screen soft menu. Physically align
the Sensor over the Meter Pulse output. During alignment view the
flashing Red LED in the rear of the „Sensor Pro‟ head for visible
activity.
N
OTE
Review ‘Status line’
information before and
during a meter test
ensures Bantam Plus is
ready and operating
correctly.
Use Form Drop down
menu to select 2S Meter
Form
Test Sequence; Multiple test
can be created. E.g. Demand
Test, Quick Test, Default, etc.
Select a Meter Test
Adjust Optics
Summary of Contents for Bantam Plus
Page 1: ......