1260-43 User Manual
Racal Instruments
©
2006
Installation Instructions 2-1
Chapter 2
INSTALLATION INSTRUCTIONS
Unpacking and
Inspection
1. Before unpacking the switching module, check the exterior of
the shipping carton for any signs of damage. All irregularities
should be noted on the shipping bill and reported.
2. Remove the instrument from its carton, preserving the factory
packaging as much as possible.
3. Inspect the switching module for any defects or damage.
Immediately notify the carrier if any damage is apparent.
4.
Have a qualified person check the instrument for safety
before use.
Reshipment
Instructions
1.
Use the original packing material when returning the
switching module to Racal Instruments for servicing. The
original shipping carton and the instrument’s plastic foam
will
provide the necessary support for safe reshipment.
2.
If the original packing material is unavailable, wrap the
switching module in an ESD Shielding bag and use plastic
spray foam to surround and protect the instrument.
3. Reship in either the original or a new shipping carton.
Module
Installation
Installation of the 1260-43 Switching Module into a VXI mainframe,
including the setting of switches SW1-1 through SW1-4, is
described in the Setup Section of the 1260A Option 01T Users
Manual, Publication No. 980806-999.
Summary of Contents for 1260-43
Page 5: ......
Page 6: ...This page was left intentionally blank ...
Page 10: ...1260 43 User Manual iv This page was left intentionally blank ...
Page 12: ...1260 43 User Manual Specifications 1 2 Racal Instruments 2006 Figure 1 1 The 1260 43 ...
Page 78: ...1260 43 User Manual Logical Relay Layout A 2 Racal Instruments 2006 ...
Page 79: ...1260 43 User Manual Racal Instruments 2006 Logical Relay Layout A 3 ...
Page 82: ...1260 43 User Manual 1260 43 Relay Layout B 2 Racal Instruments 2006 ...