4
•
When using the external controls to operate the three-point linkage, keep clear of the area
between the tractor and the implement.
•
When the implement is in transportation position, always ensure that the tractor’s three-point
linkage is sufficiently locked at the side.
•
When transporting a raised implement on public roads ensure the control lever is locked in
place to prevent accidental lowering.
2.2 Mounted Implements
•
Secure the implement to prevent it from running away.
•
Observe the max. permissible bearing loads for the trailer coupling, swinging drawbar or
hitch.
•
If a drawbar trailer is used, ensure that there is sufficient manoeuvrability at the towing point.
2.3 PTO Drive (applies only to PTO-driven implements)
•
Only use the drive shafts specified by the manufacturer.
•
A pipe shield and protective bell must be mounted on the drive shaft as well as a PTO guard –
also possible on the implement - and must be in perfect working order.
•
Ensure the specified pipe covers are used on the drive shafts when in transportation and
working position.
•
Only couple and uncouple the drive shaft once the PTO has been disengaged, the engine
switched off and the ignition key removed.
•
Ensure that the drive shaft is mounted and secured correctly at all times.
•
Secure the drive shaft guard by locking the chains in place to prevent them from turning.
•
Before engaging the PTO make sure that the PTO speed chosen on the tractor complies with
the permissible speed of the implement.
•
When using ground speed power take-off ensure that the speed is regulated by the travel
speed and that the direction of rotation changes when reversing.