![RAB ProRak 26 Quick Start Manual Download Page 4](http://html.mh-extra.com/html/rab/prorak-26/prorak-26_quick-start-manual_775679004.webp)
ProRak
MULTIBOARD
CONSOLE
STEP
3
of
6
Tools required:
4MM Allen Wrench
1.
The pieces are
rubber pads
, C1, C2, C3, C4, C5 and C6.
2.
Attach C1 to both B1s.
3.
Attach C2 to C3.
4.
Attach C4 to C3 completing the cable trough. Attach the cable trough to
both B1s.
5.
Attach C5 to C4.
6.
Attach C5 to both B1s.
7.
Attach C6 to both B1s then insert the rubber pads into C6.
8.
Tighten all the confirmat screws in both B1s but be careful you do not want
to over
t ighten them.
Use diagram below for detailed layout schematic of pieces.
NOTE: Only hand tighten the Confirmat screws.
You will do a fi nal tightening in the last step.
C1
C6
C5
C4
C3
C2
B3
C5
C3
C2
C4
B7
C6
A3
A4
C1
Rack Screws
Confirmat Screws
Rubber Pads