background image

LFLED5MBR INSTALLATION INSTRUCTIONS

Thank you for buying RAB lighting fixtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments. 
Call the Marketing Department at 888-RAB-1000 or email: [email protected]

MOUNTING Of jUNcTION bOx

To ensure weatherproof seal, apply weatherproof  

silicone sealant around the edge of the 

Junction Box

This is especially important with an uneven wall surface. 

1. 

Attach the 

Junction Box 

through the 

Mounting 

Tabs

 to mounting surface with appropriate 

hardware. Be sure the 

Wall Gasket

 is in place. 

Dimensions for drilling are shown on reverse. 

2. 

Attach 

Cover Plate

 to 

Junction Box

 with 10-24 

1/2” brass screws provided. Be sure the 

Cover plate 

Gasket

 is in place. 

3. 

All conduit entries are 1/2” NPS. Close all unused 

entries with provided 

Plugs

. Seal all conduit entry 

thread using Teflon tape or silicone sealant.

RAB LIGHTING

BRASS JUNCTION BOX

12/18/2012

RAB LIGHTING

BRASS JUNCTION BOX

12/18/2012

Wall 

Gasket

Junction 

Box

Cover Plate 

Gasket

Plug

Cover Plate

Mounting Tab

RAB LIGHTING

BRASS JUNCTION BOX

12/17/2012

4.50

114,3

[

]

45.0°

.30

7,6

[

]

1.59

[40,4]

1.59

[40,4]

DrIllING TeMplaTe fOr jUNcTION bOx

 

The template below is not to scale. Use dimensions below. 

 

45.0

°

1.59”

(40.4)mm

0.3”

(7.5)mm

4.5”

(114.3)mm

1.59”

(40.4)mm

Reviews: