FLOODINATOR
TM
INSTALLATION INSTRUCTIONS
®
Page 2
REFLECTOR ADJUSTMENT
1. Loosen (4) door screws, open door.
2. Push each side of the refl ector at point shown
below. The Refl ector will lock in position.
3. For even distribution, each side of the refl ector
should be adjusted to the same position.
4. Refl ectors are factory set at the widest beam,
Position #1.
5. To move refl ector back in, gently lift up the refl ec-
tor piece with a fl at screwdriver. Bend refl ector
back and place behind the 1st position stop.
Push Here
Position #2
Shown
Hinge
Hinge
3 Position Stops
Middle Beam
Adjustable Refl ector: Patent Pending
CLEANING & MAINTENANCE
CAUTION: Be sure fi xture temperature is cool
enough to touch. Do not clean or maintain while
fi xture is energized.
1. Clean glass lens with non-abrasive glass cleaning
solution.
2. As lamps age, light output diminishes. Mass
relamping at regular intervals ensures full light output
at the highest effi ciency.
GUARD INSTALLATION
1. Mount GDFN Guard with (4) #10-24 x 3/8” screws as
shown below.
2. Screws are provided with the Guard.
(4) Screws
HOOD INSTALLATION
1. Mount 6” Hood FNH6 or the 12” Hood FNH12
with (4) #10-24 x 3/8” screws as shown below.
2. Screws are provided with the Hood.
(4) Screws
GUARD & HOOD INSTALLATION
The wire guard and the 6” Hood FNH6 or the 12” Hood
FNH12 can be mounted to the same fi xture
with (4) #10-24 x 3/8” screws as shown below.
Narrow Beam
Wide Beam
Position #1
Position #2
Position #3