Version 24.09.2019
HW CAM(V98) / (V43)
RL4-UCON7-500
P
a
g
e
9
2.3.
Installation - ribbon cables into the monitor panel
Remove the factory monitor and open it`s housing. The daughter PCB is built to be installed
into the optical lead between the monitor panel and mainboard of the vehicles monitor.
All manuals and user guides at all-guides.com