background image

Bubble

Up®

 

Jr

 

Interactive™

 

Radon

 

Removal

 

System

  

12

 

Start

 

Up

 

Procedure

 

 

1.

 

Set

 

the

 

red

 

handles

 

on

 

the

 

bypass

 

valve

 

to

 

the

 

Service

 

position.

 

2.

 

Before

 

plugging

 

in

 

Bubble

Up®

 

Jr

 

Interactive™,

 

identify

 

the

 

plug

in

 

cords.

 

See

 

figure

 

8.

 

3.

 

Plug

 

in

 

the

 

meter

 

control

 

and

 

water

 

alarm

 

valve

 

control

 

power

 

cords.

 

4.

 

Push

 

reset

 

button

 

on

 

water

 

alarm

 

valve

 

control

 

for

 

3

 

seconds

 

to

 

open

 

the

 

motorized

 

ball

 

valve.

 

5.

 

Plug

 

in

 

the

 

yellow

 

cord

 

first.

 

The

 

blower

 

should

 

start,

 

and

 

the

 

solenoid

 

valve

 

should

 

open

 

to

 

begin

 

filling

 

the

 

tank.

 

6.

 

As

 

the

 

water

 

level

 

in

 

the

 

tank

 

rises,

 

the

 

fill

 

float

 

switch

 

will

 

tilt

 

up.

 

This

 

will

 

stop

 

the

 

blower

 

and

 

close

 

the

 

solenoid

 

valve.

 

7.

 

Once

 

the

 

tank

 

is

 

full,

 

plug

 

in

 

the

 

black

 

pump

 

control

 

cord.

 

 

8.

 

If

 

the

 

pump

 

does

 

not

 

start

 

delivering

 

water

 

to

 

the

 

house,

 

it

 

may

 

be

 

necessary

 

to

 

prime

 

the

 

pump.

  

(Normally

 

you

 

will

 

only

 

have

 

to

 

do

 

this

 

once,

 

when

 

the

 

unit

 

is

 

first

 

installed.)

 

The

 

pump

 

is

 

suspended

 

by

 

a

 

pipe

 

underneath

 

the

 

pump

 

control.

 

Unscrew

 

the

 

union

 

and

 

move

 

the

 

pump

 

control

 

off

 

to

 

the

 

side.

 

You

 

may

 

need

 

to

 

siphon

 

or

 

vacuum

 

the

 

water

 

up

 

this

 

pipe

 

to

 

remove

 

the

 

air

 

from

 

the

 

pump

 

and

 

prime

 

it.

 

9.

 

Once

 

the

 

air

 

has

 

been

 

removed

 

from

 

the

 

pump,

 

replace

 

the

 

pump

 

control

 

and

 

tighten

 

the

 

union.

 

Plug

 

in

 

the

 

pump.

  

If

 

the

 

pump

 

does

 

not

 

start

 

delivering

 

water

 

to

 

the

 

house,

 

repeat

 

the

 

priming

 

sequence.

 

10.

 

After

 

the

 

unit

 

is

 

operating,

 

run

 

a

 

radon

 

test

 

of

 

the

 

raw

 

water

 

and

 

the

 

filtered

 

water

 

to

 

ensure

 

that

 

the

 

unit

 

is

 

reducing

 

radon

 

levels

 

in

 

the

 

water.

 

 

Radon

 

Testing

 

Note:

 

It

 

is

 

important

 

to

 

install

 

a

 

new

 

sample

 

valve

 

or

 

boiler

 

drain

 

in

 

new

 

piping

 

so

 

that

 

the

 

radon

 

testing

 

is

 

not

 

influenced

 

by

 

old

 

piping.

 

 

11.

 

Perform

 

the

 

six

month

 

maintenance

 

procedure,

 

and

 

fill

 

out

 

the

 

Start

Up

 

Data

 

page

 

at

 

the

 

end

 

of

 

this

 

manual.

 

 

Operating

 

Instructions

 

 

Once

 

the

 

Bubble

Up®

 

Jr

 

Interactive™

 

has

 

been

 

installed,

 

it

 

should

 

operate

 

with

 

very

 

little

 

attention.

 

 

Normal

 

Operation

  

 

Main

 

Unit

 

The

 

unit

 

should

 

not

 

need

 

any

 

operator

 

attention.

  

When

 

water

 

is

 

used

 

in

 

the

 

house,

 

the

 

2.1

 

gallon

 

water

 

expansion

 

tank

 

delivers

 

water

 

demand.

  

When

 

the

 

pressure

 

drops

 

to

 

the

 

set

 

pressure,

 

the

 

mechanical

 

pump

 

control

 

starts

 

the

 

Bubble

Up®

 

Jr

 

Interactive™

 

pump

 

to

 

deliver

 

water

 

to

 

the

 

home

 

and

 

refill

 

the

 

2.1

 

gallon

 

water

 

expansion

 

tank.

  

When

 

the

 

mechanical

 

pump

 

control

 

senses

 

normal

 

household

 

pressure,

 

the

 

mechanical

 

pump

 

control

 

shuts

 

the

 

Bubble

Up®

 

Jr

 

Interactive™

 

pump

 

off.

  

As

 

the

 

water

 

level

 

falls

 

in

 

the

 

Bubble

Up®

 

Jr

 

Interactive™

 

main

 

tank,

 

the

 

float

 

switch

 

powers

 

the

 

blower

 

and

 

solenoid

 

to

 

fill

 

the

 

Bubble

Up®

 

Jr

 

Interactive™

 

tank

 

with

 

treated

 

water.

 

 

Low

 

Water

 

Cut

Out

 

Float

 

Switch

 

The

 

pump

 

will

 

automatically

 

stop

 

when

 

there

 

is

 

low

 

water

 

in

 

the

 

Bubble

Up

 

tank.

 

The

 

pump

 

will

 

automatically

 

restart

 

when

 

water

 

is

 

replenished.

 

 

Water

 

Alarm

 

Valve

 

 

The

 

water

 

alarm

 

valve

 

is

 

in

 

place

 

for

 

protection

 

against

 

leaking

 

or

 

overflowing

 

and

 

will

 

not

 

operate

 

unless

 

one

 

of

 

these

 

things

 

happens.

  

Once

 

the

 

water

 

alarm

 

valve

 

control,

 

overflow

 

alarm

 

float,

 

floor

 

sensor

 

or

 

terminal

 

block

 

senses

 

a

 

problem

 

in

 

the

 

system

 

the

 

water

 

alarm

 

valve

 

control

 

activates

 

the

 

motorized

 

ball

 

valve

 

and

 

shuts

 

off

 

the

 

incoming

 

water.

  

The

 

water

 

alarm

 

valve

 

control

 

will

 

also

 

sound

 

an

 

alarm

 

to

 

identify

 

that

 

there

 

is

 

a

 

problem.

 

 

Summary of Contents for Bubble-Up Jr Interactive

Page 1: ...R E Prescott Co Inc is designed to remove radon gas from water Radon is a radioactive gas which can cause serious health problems Inside the unit air is blown into the incoming water and allowed to bu...

Page 2: ...8 Start Up Procedure 12 Operating Instructions 12 Maintenance 13 Trouble Shooting 14 Replacement Parts Listing 20 Start Up Data 23 Start Up Notes 24 Appendix A 7 gpm Mechanical Head Manual 25 B Meter...

Page 3: ...epth of 26 507 lb filled to overflow water depth of 41 Influent Water Requirements Hardness 68 mg l 4 GPG Iron 0 03 mg l Manganese 0 05 mg l Plumbing Connections 1 male npt water inlet and outlet bypa...

Page 4: ...tects the pump from running dry integral check valve and operates the pump from a 2 1 gallon tank 115V AC Radon Removal Efficiency Inlet Flow and Pressure Specifications Figure 1 Bubble Up Jr Interact...

Page 5: ...ubble Up Jr Interactive Outlet Flow vs Pressure 14 GPM 0 10 20 30 40 50 60 70 80 0 5 10 15 Pressure PSI Flow GPM 7 GPM Mechanical Pump Control Pressure vs Flow House Pressure Control Pressure 0 10 20...

Page 6: ...Bubble Up Jr Interactive Radon Removal System 6 Figure 4 Radon Removal vs Flow 99 Removal at 7 GPM 90 92 94 96 98 100 0 5 10 15 20 25 Radon Removal Flow GPM Tested Results Radon Removal vs Flow...

Page 7: ...t is designed to monitor radon vent obstruction high water and fitting leaks It does this by incorporating a water alarm valve float switch water alarm floor sensor and water alarm tank top terminal b...

Page 8: ...account when positioning the unit It is best if the unit can be positioned near a drain or sump pit with a sump pump 5 Depress the high water alarm float so it is flush with the rubber cord seal Figur...

Page 9: ...lower motor If an outdoor source is desired a dryer vent kit can be modified by removing the flap check and replacing it with a screen Be sure to install the kit as directed and run the hose down to t...

Page 10: ...ol and plug pump cord into low water piggy back float cord Plug the low water piggy back float cord into the female cord of pump control See Figure 7 18 Check all plumbing fittings to be sure all fitt...

Page 11: ...ypass Valve Mechanical Pump Control Standard 54 65 Pressure Switch Yellow Float Switch Cord Black Pump Control Cord Typical Quadplex Outlet outlet not provided Use 2 20 amp Duplex Receptacles Water Se...

Page 12: ...mportant to install a new sample valve or boiler drain in new piping so that the radon testing is not influenced by old piping 11 Perform the six month maintenance procedure and fill out the Start Up...

Page 13: ...the high water float or wetting the floor sensor This should activate the motorized ball valve and shut off all incoming water Hold the RESET button on the front of the water alarm valve control for...

Page 14: ...echanical pump control 3 Unplug and remove the pump control 4 Unplug the piggy back float switch cord from the duplex outlet box on the Bubble Up Jr Interactive 5 Loosen the 4 nuts on the pump access...

Page 15: ...ugh the breather vent causing the sensors on the terminal block to detect an overflow of water Vent piping back pressure can be caused by an obstruction ice build up water trapped in a reverse pitch e...

Page 16: ...Bubble Up Jr Interactive Radon Removal System 16 Figure 9 Bubble Up Blower BUB008 Blower Attachment Nipple BUB022 Bubble Up Mechanical Pump Control BUB075A...

Page 17: ...1 Accessories Bubble Up Mechanical Pump Control BUB075A Fill Float Switch Assembly BUB007 Pump Assembly Including Motor Impellor and Check Valve BUB051B PVC Union BUB024 Well Seal BUB012 Pre filter Pa...

Page 18: ...to a Bubble Up Interactive This kit includes all of the parts necessary for the conversion Seen below are the parts included in the retrofit kit Figure 13 Interactive Components Water Alarm Valve Con...

Page 19: ...oval System 19 Figure 14 Overflow and High Water Alarm Water Alarm Float Wires Connect to terminal Block High Water Alarm Float Assembly Low water float switch grommet Bubble Up Jr Interactive Overflo...

Page 20: ...5 X 1 Bottom 3629 1 each BUB035A 3 8 X 2 5 S S HEX BOLT 4 each BUB035B 3 8 S S WASHER 4 each BUB035C 3 8 ZINC PLATED NUT 4 each BUB300 1 2 Solenoid and Water Alarm Valve Assembly 1 each BUB310 3 4 Sol...

Page 21: ...Pump Control Assembly 1 each BUB080 Meter Control Assembly W Transformer 1 each CD1402 01 Manifold w o Ports w Meter 1 each CV3630 Meter Control Mounting Plate 1 each CV3006 Bypass 1 each CV3007 04 1...

Page 22: ...Bracket Nut 2 each PA 260 300 Leak Sensor Terminal Block 1 each BUB055G Leak Sensor Terminal Block Standoff 1 4 nylon 2 each BUB055H Leak Sensor Terminal Block Screw 2 each BUB009B 1 2 XP Adapter 1 e...

Page 23: ...________________________________ Installer ______________________________________________ Address _____________________________________________________________________________ ________________________...

Page 24: ...ractive Radon Removal System 24 Start Up Notes Fill Rate ______________________________________________ Radon In ______________________________________________ Radon Out ______________________________...

Page 25: ...switch cover and making adjustments See pressure adjustment instructions under the cover 2 Adjust the large spring only until the pressure switch turns on at 45 PSI 3 Do not adjust the small spring T...

Page 26: ...mp s male power plug into the Bubble Up mechanical pump control female cord 5 To start the pump refer to OPERATION below 6 The pressure switch factory set at to turn the pump on at 45 PSI To set press...

Page 27: ...Bushing NP 10 Nozzle and Throat part of repair kit 3 1 1 4 Bubble Up Mechanical Pump Control Body 11 Stainless steel screws qty 3 4 Back Mount Pressure Gauge 12 1 4 PVC plug 5 45 65 Standard Pressure...

Page 28: ...ing from left to right across the display Flow Displays CURRENT flow rate gal min Total Flow Displays TOTAL gallons treated since last meter reset gal Peak Flow Displays PEAK flow rate since last mete...

Page 29: ...0 amps max Should be factory set at 80 which translates to 80 000 gallons 80 000 gallons is an estimated yearly service reminder for 4 people using 50 gallons per day each This threshold can be set fo...

Page 30: ...nty A serial number is required for any warranty service R E Prescott Co Inc asks you to record the serial number on the outside of the packaging when shipping the product Proof of purchase may be req...

Reviews: